Laserfiche WebLink
PC Exhibit W <br /> Outlot C, Bayview Farms 2"d Addition <br /> #13-3591 <br /> Summary Estimate of Fees* � <br /> Preliminary Subdivision Plat Application: . <br /> Preliminary Subdivision Application , � $850+$30/lot <br /> , Proposed Private Road • � $650+$0.50/lineal foot <br /> Proposed On-Site Evaluation=review charges $60 per proposed lot <br /> Application Escrow(guarantees payment of City's consultant costs) $10,000 <br /> Estimated cost of City Engineer's review of preliminary plat $7,500 <br /> (Actual cost will be billed to property owner) <br /> Collected with Application $2,484.00+$10,000 escrow <br /> Final Subdivision Plat Application: <br /> Final Subdivision Application, including Legal Review and Filing <br /> (w/covenants) (Covers first review of documents, if additional time is <br /> required,those costs will be billed to the property owner.) $700 <br /> Storm Water and Drainage Trunk Fee $3,840/acre ** <br /> (paid for the entire plat) <br /> Park Fee (8%of Fair Market Value), but no less than <br /> $3,250/per lot and no more than$5,550 per lot x#of new lots $5,550/lot <br /> Estimated cost of City Engineer's review of final plat $500.00 <br /> (Actual cost will be billed to property owner) � <br /> Final Subdivision Application Fee is paid with the Final Plat application. Storm Water and Drainage Trunk Fee, <br /> Park Fee and consultant costs are paid before the final plat is recorded. <br /> *Based on 2013 Fee Schedule <br /> ** Maximum Fee: For the 2-acre zoning districts, any lot exceeding 4.0 gross acres including wet <br /> land,shall be charged a maximum trunk fee equal to the trunk fee for a 4.0 acre parcel. <br /> 1 <br />