Laserfiche WebLink
� y _. �'�✓U C� `� �' �i��; �� � <br /> � - <br /> CITY OF ORONO SEPT'IC SYSTEI�I PER��-IIT APPLICATIO�t <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, 11�1�t 5�323 = <br /> Jos srr� �D�ss: -3 �o � � , -�`�` <br /> Occupancs• Type: Residential �_ Commercial Other <br /> - -- -- <br /> Permit T�•pe: � Netiv or Repiacement S 'ste �100.000 .� <br /> �- Repair Exi ing ystem, � 50.0 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees � <br /> *See fee schedule for non-residential permit fees <br /> Owner's I�`ame• .✓q�d ��!.Sd.✓� Phone\Tumber• <br /> Nlailing Address: City: �' <br /> Contractor's I�'ame• � dtll� .v Phonell'umber: . � - �S <br /> IYlailing Address:T 3 0 � � �`s City: e �P� s� <br /> DO \TOT ti7AII.. PAYI�'1ENT ti�I'TH THIS APPLICATIOtiT <br /> GF,��,rERAI, .J�'STRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits wi11 not be mailed out. The permit must be picked up in. <br /> person at the Ciry Offices and work must not be;in unless the permit card is on the job <br /> site. � <br /> 2, permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3, AlI work must be done in accordance �vith the approved septic system desi�n. Desi�n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover shee[ si�ned by the City Inspector. <br /> 4, The followin� inspections will be required for all septic systems: _ . <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench inscallation prior to coverin�. For mounds, inspection is required <br /> afcer rouQh-up buc prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depchs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be present durin� inspections: A 2`�" <br /> hour notice is required for all inspections. <br />