Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit #2016-00916 / 7 0 i land <br /> �/ <br /> Builder Representative Name: <br /> Permit Conditions: Initials <br /> **NOTE** It is the responsibility of the contractor to make transportation arrangements for ��I <br /> the building inspector to perform inspections to and from the site . <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to C� <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. <br /> Prior to refunding the escrow money an as-built survey and hardcover calculations must be <br /> submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a � <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <�� <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. <br /> w:\street files\big island\710\builder acknowledgement form 2016-00916.docx <br />