Laserfiche WebLink
f � <br /> Fees to be Char ed YES NO <br /> Permit � <br /> Plan Review � <br /> State Surcharge , v- <br /> Investigation Fee `/' <br /> 5AC—Number of SAC Units t/' <br /> Other(specify) <br /> S uare Foota e $ per S uare Foota e <br /> Basement X = $ <br /> 1 S'Floor X = $ <br /> 2nd FI00� X = $ <br /> Garage X = $ <br /> �7 ,p ✓--- <br /> Estimated Construction Value: $ l , l'9,��� <br /> Orono Inspections Required Work Requiring Separate Permits <br /> �. Footing � Site �,Plumbing 0 Grading/Filling <br /> �. Poured Wall ` �Silt Fence/Erosion Control �L Mechanical � Fire <br /> � Foundation Survey� � Hardcover Removal $G Fireplace � Water Connection <br /> � Framing 0 Other(specify) 0 Masonry �Sewer Connection <br /> �,Waterproofing/Drain tile �Mfg. 0 Lawn Irrigation <br /> �L. Foundation Waterproofing 0 Other(specify) � Landscaping <br /> � Framing <br /> ,�. Insulation <br /> �C As-Built Survey <br /> � Final <br /> � Lathe Required State Permits <br /> 0 Other(specify) <br /> Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> �See Builder Acknowledgement Form <br /> � Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms\plan review checklist 10-2016.docx <br />