My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00106 - detached garage
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
3300 Fox Street - 05-117-23-44-0003
>
Permits/Inspections
>
2011-00106 - detached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:22:28 PM
Creation date
11/21/2016 2:14:43 PM
Metadata
Fields
Template:
x Address Old
House Number
3300
Street Name
Fox
Street Type
Street
Address
3300 Fox St
Document Type
Permits/Inspections
PIN
0511723440003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2335 Highway 36 W <br /> , � St. Pdul, MN 55113 <br /> Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> February 24, 2011 �' Bonestroo <br /> Melanie Curtis <br /> Planning and Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re; 3300 Fox Street <br /> File No. 000139-11000-2 <br /> File No. 2011-00105 <br /> Dear Melanie: <br /> We have reviewed the plans for a proposed guest house at 3300 Fox Street. The survey is <br /> dated 12-2-10 and the site plan is dated 2-10-11. We have the following comments with regards <br /> to engineering matters: <br /> • There is a Preserve wetland on the property that will receive drainage from the guest <br /> house. Wetland buffers are required by city ordinance for this project. Section 78-1601 <br /> states that a wetland buffer will need to be established if all of the following three <br /> conditions exist: <br /> o The portion of the property disturbed by construction or land alteration activity <br /> drains to the wetland; and <br /> o The amount of grading exceeds 50 cubic yards or the construction activity <br /> involves the disturbance of more than 5,000 square feet of area; and <br /> o The redevelopment activiry results in a net increase in the square footage of <br /> impervious surfaces that drain to the wetland, or results in the relocation of <br /> impervious surfaces closer to the wetland, or results in changes to drainage <br /> patterns (slopes, meander patterns, etc) that the city engineer determines will <br /> increase the velocity or rate of runoff to the wetland. <br /> The current plans show that all three of the above conditions are proposed. <br /> • The site plan and survey pian are slightly different and should be coordinated to show <br /> the intended work on site. <br /> • This project will disturb more than 100 CY of material. Sediment and erosion control <br /> information meeting the requirements of Orono's City Code 79-7(c)(2) must be <br /> submitted. The minimum $2000 sediment and erosion control financial security should <br /> be required of the owner for this permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.