Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 26, 2016 <br />7:00 o'clock p.m. <br />3. CSAR 112 PHASE 2 DESIGN AND TRAIL EXTENSION (continued) <br />Will indicated the majority of the trail will be located within the existing right-of-way and that there will <br />be construction easements obtained in conjunction with this project. There is a little section of right-of- <br />way that will be required across two properties. Will noted the Luce Line is DNR and Three Rivers <br />property. <br />Walsh asked how wide the trail would be. <br />Will stated it is anticipated to be 8 feet wide and would follow what is being done in Phase 1, with a 7 - <br />foot wide grass boulevard to provide some separation between the curb and traffic. There is also room for <br />some signage and snow storage. The trail would be bituminous and it would basically connect in with the <br />Luce Line. Steps would also be taken to attempt to minimize the number of trees that would be impacted. <br />Will noted no final engineering has been done to date and the alignment might change slightly. <br />Walsh asked if Hennepin County would maintain the trail since it is in their right-of-way. <br />Morter indicated the trail would be maintained by the City through their agreements. <br />Council Member Levang asked whether the trail is included in the Master Trail Plan. <br />Public Works Director/City Engineer Edwards stated he does not know the answer to that at this time but <br />that he will look into it. <br />Walsh commented he would like to know what the thoughts are from the neighbor who would be asked to <br />have a trail in front of their properties. <br />City Administrator Loftus stated they have not been contacted but that there is an open house planned for <br />October 27. Loftus stated this concept could be presented that evening if the Council would like. <br />Council Member Levang commented the open house would be a good opportunity for the City to get the <br />feedback of the residents before the Council makes a decision and that she would like to ensure the, <br />residents are well notified prior to the open house that this is being considered. <br />Walsh stated the City should make sure the two property owners are spoken to prior to the open house. <br />Edwards stated the existing trail plan has a shared use trail going down Old Long Lake Road and the new <br />proposal would shift it along Wayzata Boulevard. <br />McMillan asked whether anyone would like to provide public comment on this item. <br />Rick Meyers, Park Commission Chair, stated as a general principle, the Park Commission likes to see <br />connections to the trails, but that his question is how it would be funded. Meyers stated they could have <br />the residents come to a Park Commission meeting to discuss it as well. Meyers stated the Park <br />Commission also looks favorably upon any plans where the City shares in the costs with other parties. <br />Lcvang asked when the next Park Commission meeting will be. <br />Page 3 of 26 <br />