My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Soil & perc testing - 2003
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
3200 Fox Street - 05-117-23-44-0013
>
Land Use
>
Soil & perc testing - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:22:49 PM
Creation date
11/16/2016 12:25:02 PM
Metadata
Fields
Template:
x Address Old
House Number
3200
Street Name
Fox
Street Type
Street
Address
3200 Fox St
Document Type
Land Use
PIN
0511723440013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ' ti ,�� ��rE <br /> G. MOUND SLOPE WIDTH 8�LENGTH (Greater than 1°/a) <br /> 1. Downslope absorption width =absorption width minus rock layer width <br /> 20 feet - 10 feet= 10 feet <br /> 2. Calculate mound size <br /> UPSLOPE <br /> a. Determine depth of clean sand at upslope edge of rock layer=3 feet minus distance to restricting layer(C1) <br /> 3 ft - 2.5 ft= 1 feet <br /> b. Mound height at the upslope edge of rock layer=depth of clean sand for separation(G2a) <br /> at upslope edge plus depth of rock layer(1 foot)to depth of cover(1 foot) <br /> 1 ft+ 1 ft+ 1 ft= 3 feet <br /> c. Upslope berm multiplier based on land slope(see figure D-34) <br /> Select berm multiplier of 2.86 <br /> d. Upslope width=berm multiplier(G2c)times upslope mound height(G2b): <br /> 2.86 x 3 ft = 9.0 feet <br /> DOWNSLOPE <br /> e. Drop in elevation=rock layer width(D2)times peroent landslope(C5)f 100 <br /> 10 ft x 10 % /100= 1.0 feet <br /> f. Dovmslope mound height=depth of clean sand for slope difference(G2e) <br /> at dovmslope rodc edge plus the mound height at the upslope edge of rodc layer(2b) <br /> 1.00 ft + 3 ft= 4.0 feet <br /> g. Downslope berm multiplier based on percent land slope(see Figure D-34) 6.67 <br /> h. Downslope width=downslope multiplier(G2g)times dovmslope mound height(G2f} <br /> 6.67 x 4.0 = 26.0 feet <br /> i. Select greater of G1 and G2h as the downslope width 26.0 feet <br /> j.Total mound width is the sum of upslope(GZd)width plus rock layer width(D2)plus downslope width(G2i) <br /> 9.0 ft+ 10.0 ft+ 26.0 ft= 45.0 feet <br /> k. Total mound length is the sum of upslope width(G2d)plus rock layer length(D3) <br /> plus upslope width(G2d) <br /> 9.0 ft + 62.0 ft+ 9.0 ft= 80.0 feet <br /> Final Dimensions (slope>1°�) 45.0 ft x 80.0 ft <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws <br /> � <br /> �T/` (signature) 810 (license#) /C' �/�� (date) <br /> ' � P e2of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.