Laserfiche WebLink
-- l <br /> � � <br /> %l �/ � ''`.. <br /> � CI�'�' of OROl� <br /> � , � ' <br /> ,� '� � , � i MunicipalOffices <br /> Stree4 Address: Mailing Address: <br /> ��� �'�G 2750 Kelley Parkway P.O. Boz 66 <br /> �E��� <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Cun�ent Owner of Address � � ��' F6 � <br /> City Ordinance requires that onsite sewa�e treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the followin` is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identified as Non-Compliaut <br /> Yes �� <br /> I�TO <br /> i� <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 � <br /> December 31, 2010 <br /> ather <br /> Septic 'I'anlc(s) Pump out Needed <br /> '�'es <br /> l�T o � <br /> The City recommends the septic tank(s) and/or lift tanl: be serviced and pumped <br /> o�.it everv three years. City records indicate the tank(s) were last pumped out on <br /> ( O - ,�3�" c��, . The tanl:(s) should be cleaned thxough the manhole and <br /> not tlu•ough the inspection pipes, this allows for proper cleanin�. <br /> Comments: <br /> r <br /> Ins ector����� ���"" � Date of Ins eation �P . <br /> � r <br /> 'll'e�e�non� f��'_) '_=;�'-;�6�J� � �a� (�9?) ?=s�-�n��i <br /> W'��'35�.C:.dD i 0 510.L33�➢.0.d S <br />