Laserfiche WebLink
� _. <br /> . <br /> CITY OF OROi�TO SEPTIC SYSTEI�I PERt`�IIT APPLICAT'ION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, 1��t 55323 <br /> JOB SITE aDDRESS: .�/ S� + c x S -�-r_ <br /> Occupancy Type: Residential � Commercial Other <br /> -- _----_� � <br /> Permit Type: Ne�v o Replacement �y�stem, $100.00 <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> Owner's Name: �1-11� ,� <� ,r i S d � Phone Number: y7� - 2�/� <br /> l�Iailing Address: -��� ,c S1-r - City: U �� ✓a c� Zip: <br /> Contractor's �'ame: 5,,�f,���-�-�',s u�-,f: t-y 5�^ . Phoneti`umber: 4��3-�/�0 <br /> Mailing Address: -3��c S L/�,.�-, /v i City: �,,., zG_,_{-�, Zip: �S 3� ) <br /> DO \TOT l�IAIL PAYi��ENT WTTH THIS APPLICATION <br /> GE�IERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> Systzm Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followinJ inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution piping installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin� MPCA Installer Certificate shall be present durin; inspections: A 24- <br /> hour notice is required for all inspections. <br />