My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09396 - new septic
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2920 Fox Street - 04-117-23-31-0018
>
Septic
>
2005-P09396 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:29 PM
Creation date
11/16/2016 11:05:29 AM
Metadata
Fields
Template:
x Address Old
House Number
2920
Street Name
Fox
Street Type
Street
Address
2920 Fox St
Document Type
Septic
PIN
0411723310018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM - Trenches <br /> �,��� <br /> � Eft1N1 <br /> s <br /> • All boxed rectangles must be enteretf,the rest will be ca/culafed. <br /> r�s�rgsiis- ii.- <br /> r�e sp.���.s•-s. <br /> 1. Select number of perforated laterals: 0 <br /> 2. Select perforation spacing= �ft Et �r�.,r+dowm•rur�e.►a�i+-r,�e,v«+a�o�• <br /> a.wad a a+�+»aos a.�n�.vabon <br /> 3. Since perforations should not be placed closer that 1.0 foot to � <br /> the edge of the rock layer(see diagram),subtract 2 feet from <br /> the rock la er len th 2s a �a ia an <br /> 75 -2 ft= 73 ft ao a is n 2a <br /> rock layer length to � ii �s zs <br /> 5.0 6 10 14 22 <br /> 4 Determine the number of spaces between perforations. <br /> Divide the length(3)by perforation spacing (2)and round down to nearest whole number. <br /> Perforation spacing= 73 ft/ 3 ft= 24 spaces <br /> 5. Number of perforations is equal to one plus the number of perforation spaces(4). <br /> `Check figure E-4 to assure the number of perforations per lateral guarantees <br /> < 10%discharge variation. <br /> 24 spaces+1 = 25 perforations/lateral <br /> 6. A.Total number of pertorations=perforations per lateral(5)times number of laterals(1). <br /> 25 perfs/lat x 3 laterals= 75 perforations <br /> E b: Poria+do�Gbchape In�rn <br /> B. Calculate the square footage per pertoration. <br /> perforaflon c9ameter <br /> Should be 6-10 sqfUperf. Does not apply to at-grades. i�� <br /> 1. Rock bed area=rock width (ft)x rock length(ft) �t�j / 3�16 7�s2 1!4 <br /> 10 ft x 75 ft= 750 ft� 1.0� O.7 s 0.42 0.56 0.74 <br /> 2. Square foot per perforation =Rock Bed Area/number of perfs (6) <br /> 750.0 ft� / 75 perfs = 10.0 ft�/perf 2•ob o.26 0.59 0.80 t.o4 <br /> 5.0 o.ai 0.94 �.�a i.� <br /> 7. Determine required flow rate by multiplying the total number a uio t.orootr«�npio�amiynorroc <br /> of perforations(6A)by flow per erforations(see figure E-6) b u.��.or�rro�o + e�. <br /> 75 perfs x 0.56 gpm/perfs= 42 gpm <br /> 8. If laterals are connected to header pipe as shown "�"' '°°"�,,,,,a,,,p,,,,p <br /> in Figure E-1,to select minimum required lateral <br /> diameter; enter figure E-4 with perForation spacing(2)and "'°m' <br /> . <br /> ._ <br /> number of perforations per lateral(5). ��:'°� <br /> R¢��E 1:Mmbtl laod�d al Erd W M�n <br /> Select minimum diameter for perforated laterals= 02 inches <br /> 9. If perfo�ated lateral system is attached to man'rfold pipe n,�c�z:M�.w��a '"°°� <br /> ki CMIw d ew M�+ <br /> near the center, like Figure E-2, perforated lateral length(3) <br /> aacp. <br /> and number of perforations per lateral (5)will be approximately <br /> one half of that in step 8. Using these values, select <br /> -d�� <br /> minimum diameter for perforated lateral= NA inches. <br /> �..�� <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> (signature) ��Z� (license#) G���— (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.