Laserfiche WebLink
� �11�' Cit f r n <br /> yo0oo <br /> 0�,,�. <br /> 2750 Kelley Parkway <br /> ��;.�` . P.O. Box 66 <br /> � ���"�';� ��� �-�� �,, Crystal Bay, MN 55323 <br /> � ,,,�;���d .�"" �Rr (952) 249-4600 <br /> '�;°�'�;��;`� _ G Fax: (952) 249-4616 <br /> � ;�,..��,�`e��, <br /> ESII�g' <br /> FAX TRANSMISSION <br /> Date: June 1, 2006 Page 1 of 1 <br /> To: Leonard David, Anthony Thomas Homes 763-559-6423 <br /> Harvey Blumenberg,Dolphin Pool and Spa 763-542-9001 <br /> From: Evelyn Turner, City Planner <br /> eturner _ci.orono.mn.us 952-249-4623 <br /> Subject: Permit Application — Pool House and Pool — 2920 Fox (Abraham) <br /> Before the building official review building plans planning staff reviews building permit <br /> applications for zoning code compliance. We are unable to complete this review for <br /> these permits the following reasons: <br /> 1. The "survey" submitted with the pool house application has been altered. The <br /> pool house, pool, retaining wall and associated grading were not done by the <br /> surveyor. Please submit a survey (done by a surveyor) that shows the house, <br /> well, and grades as they currently exist. The survey should show the pool <br /> house and pool as proposed, with the setbacks to property lines and the <br /> wetland indicated. A grading plan must be done by the appropriate <br /> professional. If the surveyor does this plan it can be on the survey. If <br /> somebody else does it should be submitted separately. The grading plan <br /> should show existing and proposed contours as well as the location and height <br /> of any retaining walls. A copy of the new survey should also be submitted to be <br /> part of the pool permit application. <br /> 2. If any of the retaining walls are over four feet high a building permit is required. <br /> The plans for the walls must be signed by a registered engineer. These plans <br /> ��v should be submitted at this time even if the permit will not be requested until <br /> � �p�7 later. <br /> 3. There is a 16.5 foot buffer required from the wetland. There can be no grading <br /> within this buffer area. This buffer area should be protected during construction. <br /> There is a 20 foot setback from the buffer for any buildings. Retaining walls <br /> may be constructed in the buffer setback. <br /> 4. Slopes should not exceed 3:1. <br />