Laserfiche WebLink
► - .. <br /> Per our telephone conversation, below are the City Engineer's comments. Please address his comments and submit <br /> two,full-size survey's. Once we receive the updated survey's our review can continue. <br /> Please don't hesitate to contact me if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono MN 55356 (physical address) <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ <br /> '�' 952.249.4620 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> PLEASE NOTE: Summer Office Hours start Monday, May 19,2014 <br /> Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday, May 26, 2014 (Memorial DayJ <br /> From: Jesse Struve <br /> Sent: Friday, April 18, 2014 2:48 PM <br /> To: Melanie Curtis <br /> Cc: Christine Mattson <br /> Subject: 20140418 2690 Fox St - #14-0298 <br /> Melanie, <br /> I reviewed the application for a proposed pool at 2690 Fox St and have the following comments: <br /> 1. The survey is not to scale. <br /> 2. Is the patio existing?Or proposed? The survey should reflect the status of the patio. Currently the patio is <br /> shown approximately 2 feet higher than the pool deck. Any raised portion of the patio must measure 10 feet <br /> from the edge of the pool. <br /> 3. There is a retaining wall called out on the SW corner of the pool deck. Is this a proposed retaining wall or an <br /> existing wall? If it is being proposed, the top of wall (TW) and bottom of wall (BW) should be shown. Any wall <br /> over 4' in height and not separated by 2x the height of the upper wall (as measured from the face of the upper <br /> wall to the back of the lower wall), will need to be designed by a registered professional engineer. If when I <br /> perform my as-built site review it does not meet the requirements, the applicant will be required to have an <br /> engineer sign off on the construction after-the-fact. <br /> 4. The survey should show the location of the silt fence. <br /> 5. The survey also show the alternate location of the septic system. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661- Direct <br /> (952) 249-4616 - Fax <br /> www.ci.orono.mn.us <br /> 2 <br />