My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-2015
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2660 Fox Street - 04-117-23-42-0001
>
Septic
>
septic design-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:13:34 PM
Creation date
11/10/2016 11:53:15 AM
Metadata
Fields
Template:
x Address Old
House Number
2660
Street Name
Fox
Street Type
Street
Address
2660 Fox St
Document Type
Septic
PIN
0411723420001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTIQN MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersat Media: <br /> B. Enter the Component Length: �ft Enter the Component Width: �ft <br /> C. Number of Components per Row = Bed Length divided by Component Length (Round up) <br /> �� ft ' � ft = ��components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �components X �ft = �ft <br /> E. Number of Rows = Bed Width divided by Component Width (Round up) <br /> � ft : � ft= � rows Adjust width so this is an whole number. <br /> F. Total Number of Components = Number of Components per Row X Number of Rows <br /> � X � _ �components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.5 ft = 1.5 ft Desi�n Sand Lift (optional): �ft <br /> B. Calcutate Upslope Height: C(ean Sand Lift + media depth +cover (1 ft.) = Upslope Height <br /> 1.5 ft + 1.0 ft + 1.0 ft = 3.5 ft <br /> C. Select Upslope Berm Multiplier (based on land slope): Z.86 <br /> Land Slope 9b 0 1 2 3 a 5 6 7 8 9 10 11 12 <br /> Upsiope Berm 3:1 3.00 2.91 2.S3 2.75 2.6S 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.73 2.70 <br /> D. Catculate Upslope Berm Width: Multiplier X Upstope Mound Height = Upslope Berm Width <br /> Z.86 ft X 3.5 ft = 10.0 ft <br /> E. Catculate Drop in Etevation Under Bed: i3ed Width X Land Slope : 100= Drop (ft) <br /> 10.0 ft X 10.0 % = 100= 1.00 ft <br /> F. Calculate Downslope Mound Neight: Upslope Hei�ht + Drop in Elevation = Downslope Height <br /> 3.5 ft + 1.00 ft = 4.5 ft <br /> G. Select Downslope Berm Multiplier (based on tand slope): 5.48 <br /> Lard Slope°0 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Do�vnsloF�e 3:1 3.00 3.09 3.19 330 3.41 3.53 3.66 3.30 3.95 4.11 �.29 4..?3 4.69 <br /> Berm Rat'o 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.1%+ 7.69 <br /> H. Calcutate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 5.48 x 4.5 ft = 24.7 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 10.0 ft +��ft = 14.0 ft <br /> J. Design Downslope Berm = greater of 4H and 41: 24.7 ft <br /> K. Setect Endslope Berm Multiplier: 3.OQ (usua(ly 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3.00 ft X 4.5 ft = 13.5 ft <br /> M. Calculate Mound Width: Upstope Berm Width + Bed Width + Downslope Berm Width <br /> 10.0 ft + 10.0 ft + 24.7 ft = 44.7 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 13.5 ft + 36.0 ft + 13.5 ft = 63.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.