Laserfiche WebLink
� <br /> i' � <br /> � � � <br /> CI�'Y of O1t01�� <br /> ,� , � ' Municipal Offices <br /> Stree4 dddress: Mailing Address: <br /> ���9 �'�G 2150 Kelley Parkway P.O. Boz 66 <br /> �E�T�Io <br /> - - Orono, MN 55356 Crystal Bay, MN 55323�0066 <br /> � <br /> To: The Cun•ent Owner of Address � G� �G' X <br /> c <br /> City Ordinance requires that onsite sewa�e treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the followin� is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes _� <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-?49-�626 within 10 <br /> days of recei�t of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identi as Non-Compliant <br /> �'es <br /> No <br /> If yes, system must be brouQht into compliance by: <br /> December 31, 2007 � <br /> December 31, 2010 <br /> ather <br /> Septic 'I'ank(s ump out Needed <br /> 'Yes <br /> iiT o <br /> The City recommends the septic tank(s) and/or lift tanl: be serviced and pumped <br /> olit ev�rv three years. City records indicate the tanl:(s) were last pumped out on <br /> i � -.c�( �UI . The tanl:(s) should be cleaned through the manhole and <br /> not tlu•ough the inspection pipes, this a11o«-s for proper cleanin�. <br /> Comments: <br /> ���(�� ��t�'' '.,` . C' _ <br /> Inspector: Date of Inspection C� <br /> 'lle�e��or�� (9�=) 2 r9-w6��3 � �'�:� (9�3) y��-���� <br /> w��gF.ci.��-r,�so.r:�a.as <br />