Laserfiche WebLink
. � �e �a � <br /> � <br /> LUMBER <br /> Exterior Siding -8"select knot cedar 6"exposed <br /> "Vulkem"caulk for exterior caulking <br /> Shingles-Asphalt- Horizon <br /> Roof sheathing 15/32" Oxboard <br /> Engineering roof trusses <br /> `Wall sheathing 25/32" built rite <br /> 17'8"high walls,for sports court <br /> 8' high walis for 2�d story <br /> Cedar soffits and facia on the exterior <br /> Floor joists:To be 24"fioor trusses <br /> 2"x 6"exterior walis <br /> Princeton trim-2-1/4"casing -standard 2 3/4" base <br /> Scherer Brothers windows- Metal Clad Low E2 glass <br /> Color: to match existing <br /> Six panel Hemlock/fir bifold doors <br /> Sports court addition full view door(safety glass) <br /> 5'opening for double full view doors with safety glass <br /> DEMO OLD BATHROOM WHERE HALL AND NEW <br /> STORAGE CLOSET. <br /> NOTE <br /> Where confiicts exist between these specifications and the <br /> blueprint, these specifications shall take <br /> precedence. <br /> Tony Eiden Company will add an administration fee of 15% <br /> over cost for a�l upgrades and changes <br /> Home Owner Warranty as per the State of Minnesota <br /> statute 327A. See Tony Eiden Company <br /> homeowner's manual. <br /> Tony Eiden Company will deliver your home under the <br /> latter of the following two conditions: <br /> 1. 120 days after delivery of an approved and final plan <br /> 2. 90 days after final selections has been made. <br /> The Tony Eiden Company reserves the right to upgrade the <br /> design, specifications and construction methods when <br /> deemed necessary. Prices may be subject to change. <br /> Selections by: Homeowners <br /> Estimator: Diane Eiden <br /> Date: 12-15-99, revised 2-14-00,4-15-00,4-24-00 <br /> a� <br /> �G � <br />