My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004721 - new septic system
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2555 Fox Street - 04-117-23-44-0002
>
Septic
>
1992-004721 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:00 PM
Creation date
11/1/2016 12:07:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2555
Street Name
Fox
Street Type
Street
Address
2555 Fox St
Document Type
Septic
PIN
0411723440002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�• � �. <br /> TRENCH ROCK COVERED WITH PERMEABLE <br /> SYNTHETIC FABRIC OR 4'� LAYER OF MARSH HAY OR 4 DIAMETER INSPECTION <br /> „ WELL WITH CAP <br /> PIPE TO NEXT STRAW COVERED WITH UNTREATED BUILDING <br /> INLET . DROP BOX PAF'ER (RED ROSIN) <br /> _ �� <br /> � <br /> EARTH BACKFILL AT LEAST <br /> . (J� 6" AEiOVE TOP OF ROCK ' r <br /> � . . .s������;s; •, � _� � ` <br /> ' DISTRIBUTION . PIPE . ' "� <br /> ; , �.� <br /> �-.c — � c4 <br /> . it�� �� . ,�4 <br /> <<< AT LEAST 6 DEPTH OF CLEAN • � . - ° � <br /> _ �:�. ROCK 3/4" TO 2 �/2' DIA. SEE NOTE 5. � � o �i` <br /> < < < .` <br /> DROP BOX / <br /> — MAXIMUM LENGTH = 100 FEET <br /> OVERFI�L NOTES� I . BOTT0��1 OF TRENCH MUST BE LEVEL. TOP OF TRENCH <br /> -- 4 TO 6 INCHES ROCK MUST BE �EVEL. <br /> INSPECTION <br /> � r ^ � WELL 2. SLOPE ON DISTRIBUTION PIPE IS BETWEEN <br /> � _ LEVEL AND 4 INCHES PER 100 FEET. <br /> RECOMMENDED SLOPE IS LEVEL. � <br /> BACKFILL 6" TO 12" OF ' <br /> SOIL BACKFILL 3. DISTRIBUTION PIPE CAN BE PERFORATED <br /> � �t_ PLASTIC ' INSTALLED WITH ONE ROW OF <br /> < < < L�� y.���._ � NOLES ALONG THE PIPE BOTTOM . PIPE <br /> � �2'� DEPTH OF MU9T HAVE A BEARING STRENGTH OF <br /> �.� �< < < o � ROCK ABOVE AT LEAST 1000 LB /FT. <br /> o PIPE <br /> ROCK AT LEAST 6" OF 4. SCARIFY TRENCH BOTTOM AND SIDEWALLS <br /> ` � AS HIGH AS ROCK Wl�l. BE PLACED IN THE <br /> �� _ ` o � � � ROCK DELOW , <br /> � PIPE: SEE TRENCH IN ORDER TO EXPOSE NATURAL SOIL. <br /> NOTE 5. REMOVE LOOSE SOIL BEFORE PLACING ROCK. <br /> � 18" TO 36" - � 5. 1NHERE TREES ARE PRE5ENT OR LIKELY TO BE <br /> PRESENT DURING THE LIFE OF THE SYSTEM, <br /> 12 INCHES OF ROCK MUST BE PLACED UNDER <br /> THE DISTRIBUTION PIPE. ; <br /> . � <br /> TRENCH CONSTRUCTlOfU DETA ! LS <br />
The URL can be used to link to this page
Your browser does not support the video tag.