Laserfiche WebLink
__... <br /> � � <br /> i; � � '`.. <br /> CI�'Y of UIZOl�� <br /> � �� I' Municipal Offices <br /> Stree4 Address: Mailing Address: <br /> ���,�� p�'�G 2150 Kelley Parkway P.O, Boz 66 <br /> �Tr1 <br /> Orono, MN 55356 Crystal Bay, MN 55323�0066 <br /> To: The Cun�ent Owner of Address � S S 5 �p � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the followin� is knotivn about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No ��-' � <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identificd as l�Ton-Compliant <br /> Yes �No <br /> If yes, system must be brouQht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> ather <br /> Septic 'I'ank(s) Pump out Needed <br /> 'Yes � <br /> IiT o <br /> The City recommends the septic tank(s) and/or lift tanl: be serviced and pumped <br /> o�.tt everv three years. City records indicate the tanl:(s) were last pumped out on <br /> � ��- �� . The tanl:(s) should be cleaned through the manhole and <br /> not tlu•ouah the inspection pipes, this allo�vs for proper cleanina. <br /> Comments: <br /> � <br /> Izlspecto� � ����/� Date of Inspection `/ '"� � <br /> Tlele�ho�a� (��?) 2;�-=�6�� � F�ax (�9�Z) '��-��Il�, <br /> sw��3�.ci.�_^o�o.r:�a.as <br />