My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01167
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
Permits/Inspections
>
2016-01167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:48:35 PM
Creation date
10/28/2016 9:44:18 AM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Rd
Document Type
Permits/Inspections
PIN
0811723440025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chcistine Mattson <br /> From: Adam Edwards <br /> Sent: Thursday, October 13, 2016 2:10 PM <br /> To: Christine Mattson <br /> Subject: RE: 1535 Bohns Point Road/#2016-01167 <br /> Stamped approved. <br /> Note—protected tree area from Watershed permit and grading plan do not correspond. Grading plan shows 2-4 ft of fill <br /> at the tree location. <br /> Adam <br /> From: Christine Mattson <br /> Sent:Tuesday, October 11, 2016 11:41 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: RE: 1535 Bohns Point Road/#2016-01167 <br /> Adam, <br /> We have received an updated survey. Please review and provide comments. <br /> Thank you! <br /> From: Adam Edwards <br /> Sent: Friday, September 30, 2016 2:17 PM <br /> To: Christine Mattson <CMattson@ci.orono.mn.us> <br /> Cc: Roger Peitso <rpeitso@ci.orono.mn.us> <br /> Subject: RE: 1535 Bohns Point Road/#2016-01167 <br /> Chris, <br /> I've reviewed the subject pfan and stamped it approved with the following comments: <br /> 1. Grading plan must ensure that hardcover/surface runoff is not directed to the north west neighboring <br /> property. <br /> 2. A separate utility permits will be required for the sewer connection. <br /> 3. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to <br /> any work, including demolition. Contractor must provide minimum 24 hour notice prior to inspection. <br /> 4. A separate permit will be required for the pillar/monuments at the driveway entrance <br /> Adam <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.