Laserfiche WebLink
� � Builder Acknowledgement Form <br /> Permit #2016-01167 /�35 Bohns Point Road <br /> Builder Representative Name: ,�� r\���!���� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a � <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order � <br /> r <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. � � <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to �� <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must � <br /> remain until vegetation has been established. ` —�I� <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to � <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning � j�� <br /> a n d r e p a i r o f r o a d w a y s f o r a n y a d v e r s e im p a c t s. <br /> No underground sewer within 20 feet of well. ��/\ <br /> � <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations I� <br /> must be submitted and approved. <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the � <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of � <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a /� <br /> separate Zoning Permit application to be submitted and approved prior to the work �� <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the ��� <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. � <br /> w:\street files\bohns pt rd\1535\builder acknowledgement form 2016-01167.docx <br />