My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P0969 - dock
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
849 Brown Road North - 27-118-23-34-0012 - New Address, New PID
>
Permits/Inspections
>
2006-P0969 - dock
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:30 PM
Creation date
10/21/2016 9:25:52 AM
Metadata
Fields
Template:
x Address Old
House Number
849
Street Name
Brown
Street Type
Road
Street Direction
North
Address
849 Brown Road North
Document Type
Permits/Inspections
PIN
2711823340012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . � ��� 9��� � �w�.:��� <br /> �,:*� ,:Yi `� f <br /> t h e n a t u r e g r o u p , i n c . <br /> .�� ":<-� ry Landscape design & build <br /> ���1� �. <br /> � \ <br /> 4 <br /> .r <br /> E ' + � <br /> January 30, 2006 <br /> RE: 849 Brown Road North, Orono - Water Resource Permit Application — Dock <br /> Dear Mike Gaffron, City of Orono, <br /> Thank you for our meeting on January 17th regarding a possible dock at 849 <br /> Brown Road North. We have decided to go with a seasonal dock, as sited on the <br /> plan. The location has not changed since our meeting. The dock has only <br /> become longer to cover the wetland area. <br /> Attached is a User Defined/General Permit Application for a Dock. The owners <br /> would like to access Dickey Lake, on which their property resides. We are <br /> proposing a cedar dock, to be taken out and put in seasonally. The dock would <br /> provide access through the wetland without disturbing the wetland below. The <br /> dimensions of the dock would be approximately 88' long by 3.5' wide. <br /> As we discussed at our meeting, we are also proposing a mowed path of the <br /> existing natural grasses to provide access to the dock from the yard. I have <br /> provided the following description to the MCWD: This path would not be fertilized. <br /> This path would go through the Orono 50' buffer and the MCWD 35' buffer(already <br /> within the 50' Orono buffer). We are proposing the path to 1) minimize the cost of the <br /> amount of dock, 2)for aesthetic reasons, as the path is flat land coming from the yard <br /> and not needing to be elevated, and 3)giving people a specific path to take within the <br /> buffer, therefore not disturbing other areas of natural grass within the buffer. <br /> Enclosed in this mailing is 1) a User Defined/General Permit Application for a <br /> Dock , 2) a site plan (with the setback lines, OHWL, etc from Gronberg & <br /> Associates Surveyors and TNG design overlayed), and 3) description of the <br /> actual dock from Fineline Docks of Minnetonka. 4) �� ��... <br /> If you need any further information, please feel free to call or email. <br /> Thank you, <br /> C/��� ��t�-Q�/( <br /> Amy Cheever <br /> The Nature Group, Inc. <br /> amy@tng-inc.net <br /> scott@tng-inc.net = Scott Ritter, owner <br /> 420 North 5"'Street Suite 655 Minneapolis, MN 55401 tel. 612-929-2049 fax. 612-285-8044 <br />
The URL can be used to link to this page
Your browser does not support the video tag.