Laserfiche WebLink
� [ <br /> �`:: (F <br /> Memorandum �Bonestroo '� <br /> , <br /> 2335 fGghv�ey 36 W � <br /> To: Melanie Curtis Project: Robinson Majestic Spruce Plat Date: 1/8/201 I Sc. PauI,NN 55113 <br /> From: John Smyth Clienr. Gty or Oron o Td 651-636-0600 � <br /> Faz 651-636-1311 � <br /> Re: Wetland Lode (ompliance fheck File No: 139-08000 www.bmatmo.mm ( <br /> i <br /> i <br /> Aemarks: � <br /> I <br /> There are �vo lots within the Robinson Majestic Spruce Plat There are two separate owners fa each lot It is my <br /> understanding that we likely have two separate escraws fa each lot lot I should have a$1,800 escrow and Lot <br /> � should have a$6,000 escrow. <br /> At this point most of the required work hu been completed by the awner for Lot 2 (see photo documenration). <br /> This indudes: <br /> I. Moving the pasture fence to the upslope edge of the buffer of We�and A <br /> 2. Seeding the buffer of Wedand B <br /> 3. Creating storm pond per watershed requirements <br /> There is still this�e that needs to be removed within the Buffer of Wedand A. This is required as part of the Gty <br /> Wetland Lode and was listed as an activity on the approved Wedand B�ffer Management Plan submitted by the <br /> landowner. I talked to the landowner for Lot 2 and he understands that the thisde will need to be removed prior <br /> to the City being able to rewrn the $6,000 escrow. Once this is completed he will contact the City and we can <br /> check to see if the work has been completed. <br /> During a previous site visit the buffer of We�and B on Lot I wac converted to turf and mowed by the landowner <br /> or builder. The builder was notified that this was not allowed. The mowing has �ased within the buffer. This <br /> buffer has this�e that will need to be removed pria to the escrow being returned (see photo documentauon). I did <br /> not get a chance to talk to the landowner of this lot <br />