Laserfiche WebLink
___ _ . . <br /> � � <br /> � � ',`, <br /> � � ; <br /> CI�'I' of O1t01�� <br /> ,� '� � MunicipalOffices <br /> Stree4 Address: Mailing Address: <br /> ��`� �'�� 2150 Kelle Parkway P.O. Boz 66 <br /> �E�II� Y <br /> Orono, MN 55356 Crystal Bay, MN 55323�0066 <br /> To: The Current Owner of Address ,� ��O I—O� <br /> City Ordinance requires that onsite sewabe treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treamzent system at the above <br /> address has been inspected and the follow•in� is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public alth Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identified as 1`lon-�ompliant <br /> Yes � <br /> I�TO <br /> 1� <br /> If yes, system must be brou�ht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> ather <br /> Septic Tank(s ump out Needed <br /> "�'es <br /> l�o <br /> The City recommends the septic tanl:(s) and/or lift tanl: be serviced and pumped <br /> out �v�rv three years. C'ity records indicate the tanl:(s) were last pumped out on <br /> � -- ;'�— �� . The tanl:(s) should be cleaned throuah the manhole and <br /> not tlu•ou the inspection pipes. this allows for proper cleanin�. <br /> Comments: <br /> P• <br /> Inspe��(iCJ��''-�� `G-���:./`� Date of Inspection �,_� � <br /> 'Il'e�e��a�� (��=) ?�9-�6��i � ��� ('9�2) ?�!�-��1�, <br /> w«3s.c:.��cs�o.��.�as <br />