Laserfiche WebLink
_ --�- � / <br /> � <br /> ,-'� o <br /> ���`�� CI��.' o� ��OI� <br /> , ,� , ,� <br /> � Municipal Offices <br /> "�"� ' �'�,v .,, <br /> Stree4 Address: Mailing Address: <br /> �`9���.�p'$'� 2750 Kelley Parkway P.O. Boz 66 <br /> - Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Cun�ent Owner of Address ,�� �� �� X <br /> City Ordinance requires that onsite sewa;e treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public I�ealth Threat <br /> Yes �l�o <br /> If yes, please contact the Onsite Systems Manager at 9�2-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> �yste� Ide�,tifie�' as 1`�on-�aan�liant <br /> �'es � <br /> No <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> �ther <br /> Septic T'ank(s) Pump out l�eeded <br /> Yes � <br /> 1�a <br /> The City recommends the septic tai�lc(s) and/or lift tai�l: be serviced and pumped <br /> o�_�t �v�r.v three years. City records indicate the tanl:(s) were last pumped out on <br /> �� ���� . The tanl<(s) should be cleaned throuQh the manhole and <br /> not tlu�ough the inspection pipes. this allows for proper cleanina. <br /> Comments: <br /> r, <br /> s� . � Date of Inspection �' `U' l� <br /> Aefep�o�i9 (9�2)2�9-46Q�� � �'�:� ('9�Zj ?�k9-�6�� <br /> �,�,;s.c�.aro3o.r:r,.�as <br />