My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ordinance/sewage disposal
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1840 Fox Street - 03-117-23-42-0008
>
Misc
>
ordinance/sewage disposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:38:06 PM
Creation date
10/17/2016 3:22:55 PM
Metadata
Fields
Template:
x Address Old
House Number
1840
Street Name
Fox
Street Type
Street
Address
1840 Fox St
Document Type
Misc
PIN
0311723420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Municode Page 6 of 12 <br /> Sec. 58-48. Conditional use permit and zoning variance applications. <br /> No conditional use permit or zoning variance application shall be approved for a property <br /> until the existing ISTS has been confirmed as being of adequate capacity for the anticipated use. If <br /> expansion or replacement of the ISTS is required, a site evaluation and design must be approved <br /> by the city prior to the approval of a conditional use permit or zoning variance. If the change in use <br /> intensifies the strength or quantity of flow for the ISTS, an alternate site must be designated and <br /> protected. <br /> (Code 1984, § 12.30(4)(G); Ord. No. 100 2nd series, §4, 2-10-1992; Ord. No. 147 2nd series, §9, 5-13-1996; Ord. <br /> No. 199 2nd series, § 1(12.30(4)(G)), 5-8-2000; Ord. No. 38 3rd series, § 1, 9-24-2007) <br /> Sec. 58-49. Subdivision applications. <br /> No subdivision, lot division or replatting for the purpose of creating a new building site, which <br /> property includes the use of an ISTS, shall be approved by the city until a site evaluation report and <br /> ISTS design, when required, has been reviewed and approved, and all existing ISTS have been <br /> inspected and certified by the city as being in compliance with this article. <br /> (1) Each newly created lot, regardless of acreage and which is intended for the <br /> development of a residence, shall have approved primary and alternate drainfield <br /> sites. <br /> (2) Each new lot with an existing residence connected to an ISTS must have either two <br /> future drainfield sites or one future site and a code existing ISTS which is sized <br /> correctly for the existing residence or expandable to suit a five-bedroom residence <br /> (750 GPD), whichever is greater. <br /> �3) Each proposed lot shall be capable of sustaining a five-bedroom residence and two <br /> drainfield sites to serve the dwelling including those lots with existing residences. <br /> �4) As part of any subdivision, the owner shall grant to the city in a form approved by the <br /> city a perpetual right-of-entry to allow for the future inspection of all systems, which <br /> right-of-entry may be filed in the chain of title for the property. <br /> (Code 1984, § 12.30(4)(H); Ord. No. 100 2nd series, §4, 2-10-1992; Ord. No. 147 2nd series, § 10, 5-13-1996; Ord. <br /> No. 199 2nd series, § 1(12.30(4)(H)), 5-8-2000; Ord. No. 38 3rd series, § 1, 9-24-2007) <br /> Sec. 58-50. More restrictive design and construction standards. <br /> All ISTS permit applications, site evaluations, design specifications, construction methods, <br /> and material specifications shall meet the parts of Minnesota Rules chapter 7080 adopted by <br /> reference in section 58-43 with the following additional minimum standards: <br /> (1) Site evaluation. The site evaluation report shall include the following: <br /> a� Soil borings. At least three soil borings shall be completed for each new <br /> drainfield site designed. Each soil boring must be located within the drainfield <br /> site or within close proximity along similar contours such that similar soil <br /> conditions are likely. For additions to an ISTS, at least one soil boring shall be <br /> made in the expansion area. <br /> b� Percolation tests. At least two percolation tests shall be completed for each <br /> new drainfield site designed. Each percolation test must be located within the <br /> drainfield site or within close proximity along similar contours such that similar <br /> soil conditions are likely. For additions to existing ISTS's, at least one <br /> percolation test shall be completed in the expansion area. <br /> https://library.municode.com/print.aspx?h=&clientlD=13094&HTM Request=https%3a%2f%2flibrary.municode.com%2fI-IT... 6/24/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.