Laserfiche WebLink
— ` <br /> � � <br /> ' � � '.,`, <br /> � CY�'Y of OIZUI�T� <br /> � � � <br /> � � Municipal Offices <br /> Street Address: Mailing Address: <br /> ��`q g'�G 2750 Kelley Parkway P.O. Boz 66 <br /> �E�I�o <br /> - Orono, MN 55356 Crystal Bay, MN 55323�0066 <br /> To: The Cun�ent Owner of Address ��`-�G ��' � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes � <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Ider�tified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> ather <br /> Septic 'Tank(s) Pump out Needed <br /> �'es ^� <br /> l�Ta 1/ <br /> The City recommends the septic tank(s) and/or lift tai�l: be serviced and pumped <br /> otit �very three years. �itv records indicate the tanl:(s) were last pumped out on <br /> ('v � (�- (S`-� . The tanl:(s) should be cleaned tl�rough the manhole and <br /> not tlu•ough the inspection pipes, this aliows for proper cleanin�. <br /> Comments: <br /> n � . )��� ���J`� _ <br /> Ii�sn..cto�: /W Date ot Inspzction � �� <br /> '�'e9ep:�oa��� (�5�)?=r9-w60�r � ��� (�9�2) 'd��-����i <br /> �w���.�.c�.flfics�o.r:n.�as <br />