My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wetland buffer issue-2010-11
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1860 Fox Street - 03-117-23-42-0016
>
Land Use
>
Wetland buffer issue-2010-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:38:30 PM
Creation date
10/13/2016 2:55:43 PM
Metadata
Fields
Template:
x Address Old
House Number
1860
Street Name
Fox
Street Type
Street
Address
1860 Fox St
Document Type
Land Use
PIN
0311723420016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Violation of the provisions of this article or failure to comply with any of its requirements(including violations of <br /> conditions and safeguards established in connection with grants of variances or conditional uses) shall constitute a misdemeanor <br /> and shall be punishable as defined by law. <br /> (Ord.No. 28 3rd series, § 1, 8-22-2005) <br /> Sec. 78-1614.Authority/enforcement actions. <br /> Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy <br /> any violation. Such actions may include but are not limited to: <br /> (1) In responding to a suspected article violation,the planning director and the city may utilize the full array of <br /> enforcement actions available to it including but not limited to prosecution and fines,injunctions,after-the-fact <br /> permits,and/or orders for corrective measures to the guilty party. <br /> (2) When an article violation is either discovered by or brought to the attention of the planning director,the planning <br /> director shall immediately investigate the situation and document the nature and extent of the violation of the <br /> official control.As soon as is reasonably possible,this information will be submitted to the MCWD along with <br /> the communiry's plan of action to correct the violation to the degree possible. <br /> (3) The planning director shall notify the suspected party of the requirements of this article and all other official <br /> controls and the nature and extent of the suspected violation of these controls. If the structure and/or use is under <br /> construction or development,the planning director may order the construction or development immediately <br /> halted until a proper permit or approval is granted by the community. If the construction or development is <br /> already completed,then the planning director may either. (1) issue an order identifying the corrective actions that <br /> must be made within a specified time period to bring the use or structure into compliance with the official <br /> controls;or(2)notify the responsible party to apply for an after-the-fact permit/development approval within a <br /> specified period of time not to exceed 30-days. <br /> (4) If the responsible party does not appropriately respond to the planning director within the specified period of <br /> time,each additional day that lapses shall constitute an additional violation of this article and shall be prosecuted <br /> accordingly. The planning director shall also upon the lapse of the specified response period notify the <br /> landowner to restore the land to the condition which existed prior to the violation of this article. <br /> (Ord.No. 28 3rd series, § 1, 8-22-2005) <br /> Secs.78-1615--78-1630.Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.