Laserfiche WebLink
� <br /> BUILDING LEAKAGE TEST Page 3 <br /> Date of Test: 1/31/17 Test File:Wooddale 758 Bridgewater � <br /> Data Points: <br /> Nominal Temperature <br /> Building Fan Pressure Nominal Adjusted Fan Baseline <br /> Pressure(Pa) (Pa) Flow Flow % Error Configuration Std Dev(Pa) <br /> -0.6 n/a +/-0.1 D <br /> -50.2 210.6 860 835 -0.5 Ring B <br /> -44.3 191.3 820 796 2.7 Ring B <br /> -40.1 152.1 732 710 -2.3 Ring B <br /> -34.6 127.4 670 651 -1.6 Ring B <br /> -30.7 111.1 626 608 -0.6 Ring B <br /> -20.0 85.8 550 534 15.2 Ring B <br /> -21.1 57.0 450 437 -8.9 Ring B <br /> -15.6 35.9 357 347 -11.6 Ring B <br /> -1.7 n/a +/-0.40 <br />