My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1997 Council Minutes Navarre Water Plant Public Hearing
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1997
>
09-23-1997 Council Minutes Navarre Water Plant Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:58:11 PM
Creation date
9/27/2012 3:58:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NAVARRE WATER PLANT PUBLIC HEARING <br />MINUTES FOR SEPTEMBER 23, 1997 • <br />4. Softener schematic. After filtration, water flows through three softeners which are similar <br />to home residential models. Sodium is exchanged for calcium and magnesium, the hardness <br />producing elements. 80 parts per million is a recommended standard of hardness. 0 <br />hardness for water may cause corrosion in copper pipes and tends to leach lead out of the <br />solder holding pipes together. Calcium and magnesium waste from the backwashing of the <br />filter are discharged to the City sewer. <br />5. Recommended improvements and cost estimate. Bonestroo completed an evaluation study <br />in 1995 with the following recommended improvements: <br />- Filter refurbishment <br />$ 220,900 <br />- Softening unit control replacement <br />17,000 <br />- Chlorine solution water line relocation <br />8,500 <br />- Brine storage tank cleaning <br />8,000 <br />- Softening unit renovation <br />79,900 <br />- Softening unit discharge meters <br />23,400 <br />- Electrical systems replacement <br />43,100 <br />- Automatic control valve replacement <br />9,600 <br />- Ventilation/dehumidification improvements <br />102,500 <br />- Controls replacement (SCADA) <br />73,100 • <br />- Piping replacement <br />30,000 <br />- Engineering and contingency <br />123,200 <br />TOTAL <br />$ 739,200 <br />6. Proposed project schedule. Identical to the schedule proposed in the Feasibility Report. The <br />bid opening would be early in 1998 with award of construction contract in February. <br />Approximately 6 months is allowed for delivery of materials to job site. Construction would <br />be from September to November of 1998. <br />7. Proposed project financing. Financing is proposed from three areas: <br />Assessment $263,200 <br />Cash Reserves 200,000 <br />Internal Loan from Sewer Fund 276,800 <br />TOTAL $740,000 <br />8. Assessment area. An assessment would be levied against those properties served by the <br />water system and capable of using the system. This is approximately 750 customers. <br />2 • <br />