My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-1997 Council Minutes
Orono
>
City Council
>
1997
>
09-22-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:57:33 PM
Creation date
9/27/2012 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON SEPTEMBER 22, 199'7 <br />(Mayor /Council Report - Continued) <br />undue pressure on the Staff to accommodate the applicants, With • <br />Goetten said there is u p PP <br />twice monthly meetings, there would be a cut -off time with a second opportunity for a <br />meeting in a short time period. <br />McMillan said she would support the two meeting month if it would aid Staff. She <br />suggested meetings start at 6:00. <br />Jabbour noted pressure is also applied if the meeting causes the applicant to be set back <br />in their schedule. <br />McMillan noted that the process is slow and people must be organized. <br />Goetten said delays will occur. <br />Van Zomeren indicated there have been many problems with surveys of late. <br />Goetten said she would like to see the process easier to go through. <br />McMillan said issues are becoming more complex and resulting in the Commissioners <br />reacting rather than taking the time to consider all the information. <br />Jabbour suggested a joint meeting between the Council and Planning Commission occur <br />prior to the next Council meeting. <br />ENGINEER REPORT <br />( #12) CANOPY FOR PUBLIC WORKS BUILDING ENTRY <br />Gappa said the budgeted estimate for this project is $20,000. Gappa reported that the <br />canopy for the entrance to the Public Works Building has been included in the budget <br />estimate for next year. Staff became aware of the problem last year with ice build up, <br />which has been a problem each winter. There is also no protection during rainy periods. <br />Gappa requested the project be completed this fall to eliminate problems for the <br />upcoming winter months. <br />Jabbour moved, Kelley seconded, to authorize obtaining quotations for installation of an <br />entrance canopy for the Public Works Building. Vote: Ayes 5, Nays 0. <br />Flint was informed that drain pipes are not a consideration. <br />Jabbour asked if an architectural rendering is needed. Moorse suggested the drawings for <br />a canopy be reviewed from the original building plans. <br />• <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.