My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-1997 Council Minutes
Orono
>
City Council
>
1997
>
09-08-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:56:13 PM
Creation date
9/27/2012 3:56:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON SEPTEMBER 8, 1997 <br />• ( #14B - North Long Lake Sewer Project - Continued) <br />Moorse said one sewer line would run across undeveloped property to access the <br />develoned oronerty ( Maresh)_ while the other adioins the developed nronertv with the <br />undeveloped property located behind it (Johnson). Jabbour said he sees this as a big <br />difference and is of the opinion that the properties owned by Maresh should be combined. <br />Kelley agreed that the Maresh property should be combined. <br />It was noted that the Johnson's undeveloped property is behind the developed property <br />and can be developed at a future date. <br />Vote: Ayes 5, Nays 0. <br />( #15) IRRIGATION FOR CRYSTAL BAY PARK <br />Jabbour reported that he is receiving many calls relating to the conditions at Crystal Bay <br />Park. He asked that the seeding be accomplished. <br />Goetten suggested faucets be installed instead of a irrigation system to save on costs. <br />Gappa indicated he has more black dirt to spread before seeding will occur. Council <br />• questioned where the additional dirt can be placed. Gappa said there were areas inside <br />the park where this could be accomplished. <br />U <br />Jabbour asked if the piping and faucets would have to be blown out before winter or <br />drained onlv. Garma said the piping would be underground and frost free, which would <br />not require the pipes to be blown out. The faucets are installed at ground level. <br />Goetten moved, Peterson seconded, to authorize the installation of piping and three <br />additional faucets in Crystal Bay Park by Evergreen Sprinkler Company at a cost of <br />$1,500. Vote: Ayes 5, Nays 0. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.