My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-25-1997 Council Minutes
Orono
>
City Council
>
1997
>
08-25-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:55:44 PM
Creation date
9/27/2012 3:55:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON AUGUST 25,1997 <br />( #12 - Variance for David and Jodi Rahn - Continued) <br />• <br />Jabbour suggested no building permit be granted until the conditions to be met are known <br />eliminating creating the problem. He said the question remaining is not whether the <br />project should be approved but whether what was approved is what is there. <br />Kelley responded that in that scenario, what was approved is being met. He indicated <br />that Rahn is attempting to gain the residence within the footprint and on blocks. He feels <br />the applicant is trying to meet what the Council wanted. <br />Jabbour responded that removing three quarters of a house is not the same. Jabbour said <br />he is not saying the owner should not get what the building code asks for, but the Council <br />has to make a determination of its original intent and whether the applicant diverted from <br />that intention. <br />Jabbour asked Rahn when the storm occurred that resulted in damage to the fireplace. <br />Rahn said it occurred about the time he had received application approval. <br />Rahn said when the floor joists were opened, he determined the floor had to be elevated <br />to be in compliance with code. Without doing this step, he would not have been in <br />compliance. Rahn said any further delays would create a hardship for him, and he is <br />willing to do whatever is necessary to be allowed to continue. He indicated that he <br />disagrees that only a small piece of floor remains. • <br />Jabbour indicated that Staff will continue to monitor the construction. Jabbour said the <br />Council will not get involved even if it would like to. He indicated that it is Staffs duty <br />to monitor the situation to protect the Council viewpoint. He noted that the Council <br />would most likely not change the approval due to the need to preserve the flood plain. <br />Jabbour moved, Peterson seconded, to approve the continuation of the construction with <br />further removals if required to assure proper completion of the residence at that location. <br />Jabbour said he wants Rahn to be able to remove all of the building if necessary. <br />Flint clarified that this would meet option #2 given to the Council. Jabbour concurred. <br />Option #2 states: "Allow work to proceed. under Resolution #3926 with further removals <br />as deemed necessary by the building official to assure the best possible end product." <br />Kelley asked to review the motion noting that the property is sewered, the building <br />location is the best spot on the lot for a residence, and questioned whether this would <br />have received a variance. He questioned whether the applicant would have received a <br />variance if all of the building was required to be torn down. With the house being found <br />unsatisfactory, he questioned whether the work would be allowed to continue even if the <br />entire residence was removed. is <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.