Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON MAY 27,1997 <br />• ( #18 - County Road 19ITonkaview Drainage Situation - Continued) <br />Kelley, noting the runoff problem having been created by homes built upstream, asked <br />what position the City can make regarding this increase in flowage. Code states that <br />construction of new or improved residences cannot alter the flow of runoff leaving their <br />property. He suggested a pond be built on those properties or request assistance in <br />building the pond from those home owners. Gappa said the lots had been previously <br />platted and have a steep incline that would prevent the construction of ponding areas. <br />Kelley indicated that a stormwater management plan would enable the City to seek <br />restitution from owners of residences upstream creating additional runoff. <br />Jabbour said the stormwater management plan shows how water is managed and how <br />stormwater projects can be paid as well as fund accumulation. <br />Goetten said the plan would also inform the City where ponds should be built. <br />Kelley questioned whether the cost of the project can be assessed to these home owners. <br />Barrett indicated that the City would have to demonstrate the benefit. <br />Jabbour said if a stormwater plan had been in place, it could have informed the City <br />where the pond should be built and how it would be assessed. <br />• The cost of the project is $51,780 and $10 000 proposed for the easement. <br />p J p � <br />Gappa said the stormwater fund would receive contributions from all property owners. <br />He views this project as the number one priority in viewpoint of stormwater management. <br />Flint inquired what the triggering mechanism would be for a pond requirement if a <br />stormwater management plan was in effect, whether a subdivision or building permit. <br />Gappa said each home is currently evaluated and subdivisions are reviewed as a whole. <br />Jabbour indicated that the City and water will be studied and regional ponding areas <br />determined. Residents upstream can make contributions to a pond rather than build a <br />NURP pond. Jabbour said developers would prefer that option. The fund would be <br />levied by on -going fees and by new development. It is currently micro- managed by <br />individual issues instead of proactively. Jabbour said building permits trigger the action. <br />Gappa noted that if a pond cannot be built on the particular property, a contribution <br />would be made to a pond downstream. <br />Mr. Bessesen noted that if the homes upstream had been required to contain water on <br />their properties and not add to flowage, there would not be the problem that is occurring <br />today. He questioned how excess runoff is controlled. He was informed that while there <br />• are structural coverage limitations, there are no hardcover controls on non - Lakeshore <br />properties. <br />21 <br />