My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1997 Council Minutes
Orono
>
City Council
>
1997
>
03-10-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:06:42 PM
Creation date
9/27/2012 3:06:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON MARCH 10, 1997 <br />• ( 96 - Bracketts Point Sewer Project - Continued) <br />Eric Beringause, 1489 Shoreline Drive, property owner of Lot #13, inquired about the <br />connection for lower and upper septic systems. Gaffron indicated the connection for <br />sewer would be at the property line, and the resident bears the cost of connecting from <br />the house to the property line. <br />Janet Kiernan, 1491 Shoreline Drive, property owner of Lot #14, inquired when the <br />neighborhood meetings were held. She was informed that they occurred prior to her <br />purchase of the property. Kiernan had concerns with how the sewer project would affect <br />the improvement projects underway on her property. She was informed that she will <br />have access and experience perhaps one day where access may be a problem when the <br />driveway is being torn up for sewer installation. She noted that she was moving the <br />location of her driveway. Gaffron said the City would coordinate the coinciding projects <br />with the engineers. Kiernan should not experience any problem with extending her <br />permit if necessary due to the sewer project. Gaffron indicated that Kiernan will be asked <br />where she would prefer the connection to sewer be made. It was noted that a 20' <br />separation will be required between the air - tested sewer line and well. If the sewer line is <br />not tested, a 50' separation is required. <br />The need to coordinate the County project of overlaying CoRd 15 with the sewer project <br />was noted. Moorse will work with the County in this effort. Harlan Olson indicated that <br />• the sewer will not be located in any of the blacktop portion of the road but in the right - <br />of -way. <br />Kiernan asked when the easement requirements will be known. Olson said it would <br />occur in May when the final design is completed. <br />Schmitt inquired about the financing. Jabbour said the assessment hearing will answer <br />financing questions. The financing will depend on the prevailing rate and extend for a 15 <br />year time period. Jabbour reiterated that the project will only occur if there is a favorable <br />reaction toward the acquisition of easements and assessment. <br />The public hearing was closed. <br />Flint inquired whether the property owner of Lot #5 understands the need to pay for 3 <br />sewer units. Gaffron said the discussion has not included the number of units but the <br />property owner was party to the initial request for sewering. He indicated that according <br />to the assessment policy, the guesthouses would be a fractional portion of the amount, <br />and the resulting number of units would be in the range of 2 or 3 for that property. <br />Jabbour asked Staff to send results of this hearing to all of the property owners so there <br />is an understanding of the impact of the project. The information will be sent to the <br />• property owners affected by both agenda items 5 and 6. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.