My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06956 - new septic system
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1640 Fox Street - 03-117-23-14-0004 - New PID
>
1640 Fox St - 03-117-23-14-0002 - Old PID
>
Permits/Inspections
>
2003-P06956 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:43 PM
Creation date
10/10/2016 2:29:59 PM
Metadata
Fields
Template:
x Address Old
House Number
1640
Street Name
Fox
Street Type
Street
Address
1640 Fox St
Document Type
Permits/Inspections
PIN
0311723140004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���M�����F� <br /> „�,�,_��Roo�s. xrnr�c�sF�nu� <br /> o�s��oa�ts w����us a�sicN. <br /> the same time the Multi-Flo is serviced. Lab samples will be needed to test for fecal <br /> coliforms, recommend 1 time a year at a cost of$75.00 to $100.00 per test. The <br /> samples must be less than 2000 colonies/100m1 of effluent. If the sample is greater <br /> than this a new sample will need to be taken in 30 days. Inspection pipes will need to <br /> be installed to the bottom of the sand filf and bottom of the rack bed. <br /> The1st tank will be a 1000 gallon trash trap. The 2nd tank will be a 1500 gallon dosing <br /> chamber (pump #1) which will dose 18.7 gallons every 30 minutes with a timer to the <br /> Multi-Flo Unit. The effluent wifl flow gravity from the Multi-Ffo to the 2000 gallon <br /> pumping chamber (pump #2) which will pressurize the seepage bed. The power supply <br /> and switches must be located outside the manhole and pumping chamber in a weather <br /> proof enclosure. A warning device must be installed with a light and sound device, this <br /> is in case of a pump faifure. <br /> The Mitigation Plan is If hydraulic overloading would occur, a timer could be installed to <br /> reduce the amount of effluent pumped to the system and also by using the 2000 gallon <br /> pumping chamber allows the effluent to be stored during peak use and pumped to the <br /> system during low water use periods. The second would be to install holding tanks. <br /> A water meter will need to be installed to monitor daily water use. <br /> The soils at a depth of 18" have a percolation rate of 11.4 mpi. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> Design is not valid &the system wilf need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.