Laserfiche WebLink
�i� �� �.� �,a�� <br /> �7 ' �� <br /> / � �yn� <br /> CITY OF ORONO �j�,L� SE�C SYSTEM PERMIT APPLICATION <br /> Boz 66 (2750 Kelley Parkway) �eC�rV�� <br /> Crystal Bay,Mn 55323 ���, 2 <br /> 2 200, <br /> JOB SITE ADDRESS ��`�� �� �+��-e-�' CITY OF ORO/�p <br /> Occupancy Type: Residential�,_ Commercial Other <br /> Permit Type: New or Replacement System $100.00 l�� � <br /> Repair Eaisting System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: ,�.u-�� �'}��'� Phone Number: <br /> MailingAddress: /(o o �-ak �'e� City: �S�'a� o Zip: <br /> Contractor's Name• ' � Phone Number: 7G 3-29S-a s�i <br /> Mailing Address:_ � -� City: s�.�cu-� Zip: 5-S�lo�.- <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The pernut must be picked up in person <br /> at the City Offices and work must not begin unless the permit cazd is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Insta.11ers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desi¢n reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections �vill be required for all septic systems: <br /> A Pre-insta.11ation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jaz tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where requued) components are functional and comply with codes. � <br /> 5. Individual holding 1�LPCAInstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />