Laserfiche WebLink
TRENCH ANI3 BED WORKSHEET , <br /> �1. �1 VFRAGE DESIGN FLOW A-1: Estimatad Sawafla Flow�in Gallons per Day <br /> A. Estimated � D� gpd(see figure A-1) num or o <br /> or measured x �(sa e actor)= d badrooms ciou i ciau n ciaa iu aa�iv <br /> f�✓f � 2 300 225 180 60% <br /> B. Septic tank capacity o n o allons(see figure C-1) 3 aso aoo 2i a or me <br /> ' fTb}� �`7 4 600 375 256 values <br /> 5 750 450 294 In the <br /> 2. SOILS (Site evaluation data) a 900 525 ss2 ciass i, <br /> C. Depth to restricting layer= 9 te.� feet > >� � 3�o u,or m <br /> D. Max depth of system Item 2C-3 ft= ft-3 ft= � � ft 8 �� b�s aos columns. <br /> 1, S, �.o� �.3 5��'"�'�F'!�^S)V�• <br /> E. Textuze ��-�`� Lp'Awl Percolation rate 11.y MPI <br /> F. Soil Sizing Factor(SSF) �.d sqft/gpd(see figure D-15) <br /> (�,. %Land Slope % �� ' �s�•'"�+*'► C-1: Se tic Tank Ca acides in allons <br /> 3. TRENCH or BED BOTTOM AREA Number of Minimum li uid Li uid ca aci W�� Liquid capacity <br /> Bedrooms Capacity9 garba a�sry�i W��disposal& <br /> H. For trenches with 6 inches of rock below the pipe: g P° lift inside <br /> A x F=�pd x sqft/gpd = sqft 2o�ioss �so >>u �� <br /> I. For trenches with 12 inches of rock below the pipe: 3 ora �000 �soo Z� <br /> 5 or 6 1500 2250 3� <br /> A x F x 0.8 = gpd x sqft/gpd x 0.8= sqft 7,s or 9 z000 3000 <br /> J. For trenches with 18 inches of rock below the pipe: <br /> A x F x 0.66=e Cj X S ft� C�X�.66= s ff D-15: Soil Characteristics and Soil Sizing <br /> P 9 � q Factor(SSF)(>3'ee aration) <br /> K. For trenches with 24 inches of rock below the pipe: r..�o�.�:o�R.�. Soil Sizing Factor <br /> A x F x 0.6=end x sqft/gpd x 0.6= sqft m�utes per inch So►�T.x�,.r� w�a FKfty°"°" <br /> L. For pravi{-��beds with 6 or 12 inches of rock below the i e• f.�«�w.�,o.�• c�..x�^d o.� <br /> p `J PP � O.1to5 M«d'u��dd 0.83 <br /> 1.5 x A x F= 1.5 x�,e,ud x sqft/gpd = sqft o.,�os•• Finesand �.6� <br /> 6 to 15 Sandy loam 7.27 <br /> For pressure beds with 6 or 12 inches of rock below the pipe; �6�e� Loem <br /> AxF= p,�,� ,,,.,dx �.t� s ft/ d = S��Os ft 3��045 � 2 <br /> --i�--bY q $P q ae�0 6o ci:y io,�„ 2zo <br /> s,�dy d.y <br /> s�ity�i.y <br /> 4. DISTRIBUTION(Check all that apply) over 61 to 720"' �dY���Y ..zo <br /> �Bed (<6%slope) Drop boxes (any slope) � Rock slower than 120"••s''�'�''Y <br /> Trenches Distribution box (<3%) Chamber • �sY.«ms or rapi y permta �.o�g: <br /> preasure distribuHon or senal distribuNon with <br /> Pressure Gravit Gravelless �o trench>25%of the total system. <br /> Y •'Soil having 50%.or more fine sand pius very fine sand <br /> •'•A mound mu�[be used. <br /> "'An other or per(ormance ry�tem must br used <br /> 5. SYSTEM WIDTH,LENGTH and VOLUME <br /> M. Select trench width= ft D-9: Soil Characteristics and Soil sizing <br /> factors(SSF)for Gravelless Pipe <br /> N. If using rock,divide bottom area by width: (H�1�J�K OT L�=M= percolation rete lineal feet/ <br /> SClft= ft= lineal feet (minutes/inch) soil texture gallon/day <br /> Rock de th below distrib tion i e lus 0.5 foot times bottom area: Fas�e<<n�,o.i• Coarse Sand — <br /> p �-� P�P P 0.1 to 5 Medium Sand 0.28 <br /> Rock de th in f et+9�t'eet x Area (H,I,J,K,or L) c.a�,�,y sar,a <br /> p �.� 0.1 to 5 Fine Sand•• 0.6 <br /> ( /,0 ft+(�=�'ft)x 4SL o a sqft=a3y Q cuft 6�o ls Sandy Loam o.az <br /> ]6 to 30 Loam 0.56 <br /> Volume in cubic yards=volume in cuft divided by 27 3]to45 Silt Loam o.b� <br /> suc <br /> �34 t� cuft=27=`�Zcuyds as�o eo cia Loam(CL) oaa <br /> Weight of rock in tons =cubic yards times 1.4 �si�ci _ <br /> slower than 60•' C ay <br /> �5 7 cuyds x 1.4=1�� tons Sandy Clay <br /> s;�ry ciay <br /> O. If using 10"Gravelless Pipe, Flow (A)x Gravelless SSF(see figure D-9) <br /> 5oil too coarse for sewage treatment. <br /> �pC�X lineal feet/gpd = lineal feet Use systems for rapidlype rmeable soils. <br /> "Soil having 50%or more Ti�sand+very fine sand. <br /> P. If using Chambers,H,I,J,or K (based on height of chamber slats)= ••5oil with too high a percentage of clay fo� <br /> width of chamber in feet(M) instauation of a standard inground system. <br /> sqft+ ft= lineal feet o-,o.Q �kx��kF+brk <br /> `'°'� s�::�:: �z-�«e.a <br /> a::s`�s`5�. . q:, <br /> 6. LAWN AREA 4:�4�' .b���b� f,•a.��;,� a`� <br /> s.'s::o. ;.�s � 9�� <br /> Q. Select trench spacing,center to center= feet b;a:�; ..•.a,' " <br /> �,�,b�..4...,b'wb;,b, <br /> R. Multiply trench spacing by lineal feet R x Q=sqft of lawn area °::�:qs�:Y:4•e��:�;�; <br /> 4 y'.,'e�bYb:,bi e;y:;q;d <br /> �_ft x 72- lineal feet=�4S 0 t� sqft <s==�=`qy�`o�o~` 6-24"Ro�x �.a►� <br /> onb�°'��:Y,b'�4:bwb a�� 3�4-21�2�� <br /> :s::c=.�s::b,:a.�o,.o:a. <br /> o1's:�:s:.o,;G;o b;•'y��'s,�� • <br /> o:�DY��$_S��bi: c�.o=aF <br /> 7. LAYOUT a�;��������'s=s•� <br /> 1&36'Wdlh <br /> Include a drawing with scale (one inch=��feet). Show pertinent property boundaries,rights-of-way,ease- <br /> ments, location of house, garage,driveway,and all other improvements, existing or proposed soil treatment system, <br /> well and dimensions of all elevations,setbacks and separation distances. <br /> I hereby certify that I have mpleted this work in accordance with applicable ordinances, rules and laws. <br /> ,i` �^--- ��' � � � (signature) 3�� (license#) �' ��3—�3 (date) <br />