Laserfiche WebLink
. <br /> CITY OF ORONO APPLICATION FOR DSliOLITION PSRMIT <br /> P.O. Box 66 (1335 So Brown Rd) <br /> Crystal Bay, MN 55323 <br /> � SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> *�*#******��***t****::****�*t******:**�*:*t***�*�******�*****#***:*:****** <br /> General Instructions <br /> l. You may be required to obtain other permits, i.e. burning, well <br /> abandonmment, etc. <br /> 2. Work must not begin unless the permit card is available on the job <br /> site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> *****�***********�**:�****#:�*******#�t*:*��*���****:*�*:t****�***.t�r**�**:* <br /> JOB SI TE ADDRESS: 1 ���J �C=,1C �,�� <br /> Occupancy Type: Residential Commercia� <br /> OWNER'S NAME: � , C�L�1��4,�, Phone: t( S� � - v O � � <br /> Mailing Address: City: <br /> cox�cTOR�s N�: sus. No. : <br /> Mailing Address: City: <br /> �**t*��**t*:***�:�:*�*�******:****::*�t***��*�*t*��*�***t*::��t***t**:*�*** <br /> Demolition if planned by means of: manual disassembly heavy equipment <br /> _burning (by fire department) <br /> Permits Issued: <br /> # Burning Fire Department <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner <br /> hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time <br /> as demolition is complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the <br /> public rights-of-way unless specific prior approval is obtained in <br /> writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in <br /> accordance with all applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Aealth <br /> Department regulations. <br /> 6. Inspection required when aIl debris has been removed, before <br /> backfilling. <br /> 7. Within 5 working days of superstructure removal , a final inspection <br /> shall be requested. The site shall be left clean and clear of all <br /> debris, with any excavation filled with earth level with the adjacent <br /> ground elevation (except when such excavation is to be used as part of <br /> a new building and such new building is acivally under construction). <br />