Laserfiche WebLink
_ __- <br /> Erosion Control Supplemental Information <br /> Final Stabilization will be provided with (seed, sod, etc): _ � 'v � <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> Off site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone, whichever is greater, of all vegetation to be retained. <br /> r Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for ail projects disturbing'/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual ident�ed as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available a1 the District's request within 24 hours.Records of each inspection and <br /> maintenance activity sha11 include: <br /> i. Date and time of inspections; <br /> ii. Name ofperson conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party campleting <br /> maintenance activities); and <br /> v. Date and amount of all rainfall events greater than D.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name I�i � �Ir l„ <br /> Organization� b Q �L � $ f s � W C <br /> .r---- <br /> Phone (Q�?r ����'�b� Alternate Phone 9J� •3 y,�= D 7J <br /> Email �� N � w OOd���`�1�� L�G �t S . C.A Nh� w�► <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> -�---_---- <br /> � ---- -----_�� �� � <br /> Signature of Applicant ar Authorized Agent Da�� <br />