Laserfiche WebLink
PLAN F�EVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: �') p ���p��/' Permit No.: ��(0 — ��Q3(a <br /> Description of work: �UVv Stl�� �"'��1{�X .u� Date Rec'd: _ $'�•�(i� <br /> Septic review by: � Y � Date Approved: <br /> Zoning review by: Date Approved: -1 �� I� <br /> Building review by: Date Approved: � <br /> Grading review by:_ f'L Date Approved: �� !�' �� <br /> Zoning District: Zoning File#: ✓ Reso#: ✓ Reso Date: '� <br /> � <br /> Zoning: Lot Area: � F AC Width: �� Lot Coverage: /1/ SF — % <br /> Survey Submitted: �Yes .. � No Date of Survey: $ � l fi Revised date ? : <br /> Landscape plan submitted? Yes � No Landscaper: !`�L�/U�6 <br /> Proposed Setbacks: <br /> Front (�a�s}-- Rear(�Strtetj• (�S E W ) ( N�E W ) Other Buildings Wetland <br /> Side Side <br /> .��� ��� ( �l � Z�• �--� `�. � -4- � <br /> l I � <br /> Defined Height: Z. Peak Height: 38 FFE: 103�. FFE minus 6 feet= ��2.�, (Existing Contour; <br /> Perimeter(linear feet) = l0 � 50/o= � <br /> ' ° �2- � ''�'�_L.F. below grade <br /> Basement? � Yes �d;No, _��Stories O I/ ./ <br /> t� <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> START WITH floor(of the basement or crawl space)and measure from hiohest existinq <br /> 3 g`D the highest point of the roof. START W ITH rade to the highest point of the <br /> roof even if fill was brought in to <br /> If you have a... elevate home. <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ^ D ROOF TYPE) between the highest point of the roof hi hest oint of the roof. <br /> l a to the low point of the corresponding If you have a... <br /> ���� gable or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, . GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> � � (BASED ON basemenUcrawl space floor and the the top of the highest <br /> �'S EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> � EQUALS Defined building height subtraction. <br /> � Defined building height <br /> �� EQUALS <br /> Updated: May 2016 <br /> z:\forms\plan review checklist 5-2016.docx <br />