Laserfiche WebLink
0 <br /> � <br /> � _ _ - <br /> � � o NOTES: <br /> v ; � � ' - <br /> � _ �� � --' 1. MAIN LEVEL FLOOR SHEATHING TO BE 3/4" PLYWOOD/OSB PLACED IN STAGGERED PATTERN NAILED w/0.131"f� x 3" ' <br /> � � � ' LONG NAILS @ 6" O.C. AT PANELS EDGES &�a 12"O.C. @ PANEL INTERIOR SUPPORTS OF EQUIVALENT. <br /> � N J r 2. NAILS IN BLOCKING ARE TO BE PLACED SUCH THAT THE WOOD DOES NOT SPLIT. <br /> _ = ��c � �. ,•..r <br /> a S �A����..� 3. BLOCKING MEMBERS SHOWN MAY BE REPLACED WITH PRE-MANUFACTURED TRUSS STYLE OR FULL DEPTH MEMBER <br /> � � N A A s � BLOCKING SUCH AS I-JOIST OR LVL DESIGNED FOR 1,500 POUND LATERAL COMPRESSIVE LOAD. NAILING SHOWN IS TO <br /> � � `� � o � o BE USED AT MINIMUM. <br /> � �� � � � p a> 4. BLOCKING DOES NOT HAVE TO BE PLACED IN ADJACENT BAYS. IF REQUIRED USE ADDITIONAL 2x4 SPACERS AS <br /> ° � � n � � n S H O W N I N F I R S T S P A C E. <br /> � z �. � z z � 5. HOLES MAY BE INSTALLED IN BLOCKING IF REQUIRED UP TO 4" IN DIAMETER, MAINTAIN 3" EDGE DISTANCE. <br /> r Cn (/� � � rn � <br /> Z � <br /> � � <br /> y '� C��D � � 'U Z <br /> � D <br /> � z � � � � DUCT/MECHANICAL(AS REQUIRED) <br /> m � o Z r" BY OTHERS <br /> n � � m NAIL SHEATHING TO BLOCKING/TRUSSES FRAMING <br /> . � p w/(12) 0.131"PSx3" LONG NAILS BY OTHERS <br /> o c <br /> � z 0.131 m x 3" LONG <br /> n A _� NAILS Qa 6" O.C. <br /> � � \ RIM TRUSS <br /> n o Z , � � <br /> � � ' BY OTHERS <br /> �' ' TOP NAIL RIM TO SILL <br /> � o �o � � w/MIN OF (12)0.137 f�x <br /> � � °� m 3" LONG NAILS EACH <br /> ��� z o SIDE OF BLOCKING OR <br /> � � m TYPE D CONNECTOR @ <br /> � � . BLOCKING SEE S10 <br /> ' 2x6MIN <br /> � � SILL PLATE <br /> w <br /> � FOUNDATION WALL SEE <br /> w TRUSSES BY OTHERS e OTHER SHEETS FOR <br /> � PROVIDE 2 x 4 MIN BLOCKING p ANCHORS &WALL INFO <br /> ° o o � TOP & BOTTOM OF TRUSSES a <br /> �;, �, � Z AS REQUIRED TO ACHIEVE a SLOPE GRADE AWAY FROM <br /> NAILING SHOWN. ° FOUNDATION <br /> � � WSTALL w/(2) 0.131 f�x 3" ��(_��_�� <br /> _� LONG TOE NAILS ° oi�,I I I—�I�—���--� <br /> �', I 3/4" PLYWOOD/OSB ONE SID I <br /> E F REQUIRED, PROVIDE 2 x 4 MIN SPACERS <br /> OF BLOCKING w/(6) 0.131 �x 3" SEE S11 FOR SPACING OF TOP & BOTTOM AT MECHANICAL UNTIL <br /> 0 <br /> LONG NAILS TOP & BOTTOM BLOCKING SYSTEM SHOWN SPACES IN WHICH BLOCKING CAN BE <br /> � OR 1/2" PLYWOOD/OSB EACH INSTALLED, TOE NAIL TO FLOOR MEMBERS <br /> SIDE OF BLOCKING EACH w/ w/(2) 0.131 PS x 3" LONG NAILS <br /> � (4) 0.131 �x 3" LONG NAILS <br /> � TOP & BOTTOM <br />