My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence re septic system
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1540 Fox Street - 02-117-23-32-0003
>
Correspondence
>
Correspondence re septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:09:14 PM
Creation date
10/7/2016 12:36:48 PM
Metadata
Fields
Template:
x Address Old
House Number
1540
Street Name
Fox
Street Type
Street
Address
1540 Fox St
Document Type
Correspondence
PIN
0211723320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 30, 1997 <br /> Stephen Weckman <br /> City of Orono <br /> P. O. Box 66 <br /> Crystal Bay, MN 55323-0066 <br /> Dear Mr. Weckman: <br /> I received your letter over the weekend. I appreciate your sending me the information <br /> regarding the "triggers" which necessitate a septic system upgrade. I would like to correct <br /> you on the scope of the construction on our house. Two bathrooms were not added. Two <br /> bathrooms were relocated. A laundry room was not added, it too was relocated. A <br /> garbage disposal was not added. There has been no increase in any bathrooms or <br /> mechanical equipment whatsoever at our house. The only increases were attaching a <br /> garage and adding a family room off of the kitchen. <br /> As you state in your letter, to facilitate the construction, I agreed to put money in escrow. <br /> In the event it was determined that a septic system upgrade is necessary. I remain prepared <br /> to do so. However, I did not see anything in the City Ordinances that requires or <br /> "triggers" a septic system back in 1996 nor do I see anything now. You will recall that I <br /> have mentioned this many times before and we have had this discussion before. <br /> As stated above, I am prepared to move forward. As I mentioned in my previous letter, <br /> although it has not been easy to get responses, I have finally received a bid (albeit only <br /> one) to perform the work based on the most recent system design. Nonetheless, while I <br /> am certainly willing to comply with the city ordinances, I do not see that the ordinance <br /> requires me to upgrade the existing system. I should add, the existing system shows no <br /> sign whatsoever of failing. <br /> Please advise me as to the City's position on the above. <br /> Very trul yo rs, <br /> � <br /> � cirY oF <br /> . ORONO <br /> �.��f���.�r� <br /> John Nolan <br /> cc: City Administrator J��' 2 1��7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.