Laserfiche WebLink
,-_-�—�__ � <br /> � � " �' <br /> ;','' � � ,', <br /> , CI'�'�' Of OROl�� <br /> ��� ,� - � ��' <br /> � � � ' Municipal Offices <br /> Street Address: Mailing Address: <br /> ��`9If p4�'�G 2750 Kelley Parkway P.O. Box 66 <br /> ESTrI <br /> - Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address � ���d ��' � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the followin� is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> I�o <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> le�al action. <br /> System Identified as 1\Ton-Compliant <br /> Yes <br /> No <br /> If yes, system must be brou�ht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> �ther <br /> Septic Tank(s ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tanlc(s) and/or lift tanl: be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �1 - �I - �� � . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> In c o��,�.�- Date of Inspection �r � (ra . <br /> 'Telephone(9g2)249-4600 � �ax(95?) 249-4616 <br /> w�w��.ci.oroeeo.mn.us <br />