My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00606 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1380 Fox Street - 02-117-23-31-0009
>
Permits/Inspections
>
2012-00606 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:52 PM
Creation date
10/5/2016 11:29:55 AM
Metadata
Fields
Template:
x Address Old
House Number
1380
Street Name
Fox
Street Type
Street
Address
1380 Fox St
Document Type
Permits/Inspections
PIN
0211723310009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pian Review Checkfist for New Structures / Additions <br /> Address/ PID / Legal: � 3�� r� x <br /> Description of work: ��U��.- �:�'C.k�,�c,'�� ��Si 1��:, <br /> Septic review by: /�/�►� il.•�"` Date Approved: <br /> Zoning review by: /Ui'✓'� Date Approved: <br /> Building review by: 5���,ns,..� Date Approved: �T-2�' - � �� <br /> Grading review by: ,�' � Date Approved: <br /> Zoning File#: Resolution#: Resolution Date: <br /> Zonin District Fire Department Post Office School District <br /> \ <br /> Zoning: Lot Area: SF/AC Width: 'Depth: <br /> Survey Submitted��. � Yes ❑ No Date of Survey: <br /> Proposed Setbacks: �'�. <br /> Front (Lake) Rear''(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> � <br /> Building Defined Height: �\ Building Peak Height: #of Stories Ok?: 0 YES <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPA : FO A BUILDING ON A SLAB FOUNDATION: <br /> START WITH the distance between the basement flo /crawl TART the distance between the slab and the highest <br /> space floor and the highest roof peak,the op of WITH roof peak,the top of the cornice of a flat roof, <br /> the cornice of a flat roof,the deck line of a �, the deck fine of a mansard roof, or the <br /> mansard roof, or the uppermost point on a rourlc� uppermost point on a round or other arch-type <br /> or other arch-t e roof roof <br /> SUBTRACT half the distance between the highest window nd SUBTRACT half the distance between the highest window <br /> hi hest roof eak of a itched roof and hi hest roof eak of a itched roof <br /> SUBTRACT the distance between the basement floor/ rawl DD the distance between the slab and the highest <br /> space floor and the highest existing gr e within existin rade withinthe foundation <br /> the foundation or 10 feet, whichever'�iess. EQU S Defined buildin hei ht <br /> EQUALS Defined buildin hei ht <br /> Lot Coverage: SF % <br /> Shoreland District MC Permit Received � Av_erage�Lakesh re Setback Bfuff <br /> ❑ s � No � N/A � ❑ Yes 0 No <br /> ❑ Yes 0 No � ❑ Yes ❑ No N/A <br /> ,Aermit Number: Setback: <br /> Hardcover Zones Existin Proposed Variance Required CUP Required <br /> 0-7�' ❑ Yes ❑ No 0 Yes � No <br /> 75-250' TYPe(S): TYPe(S): <br /> 250- 0' <br /> 500-1 00' <br /> REMARKS (in-house): �11�� C�-�� <br /> Updated: 09/11/2009 <br /> z:lformslplan review checklist.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.