My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-13-1998 Council Minutes
Orono
>
City Council
>
1998
>
07-13-1998 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 4:22:00 PM
Creation date
9/26/2012 4:22:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />ORONO CITY COUNCIL MEETING <br />MINUTES FOR JULY 13,1998 <br />Mayor /Council Report - continued <br />Flint reported on the Highway 12 Design Review Committee meeting held Wednesday, July 8. <br />Because of the location of the new Highway 12 Corridor the Wayzata Public Works Maintenance <br />facility will need to be relocated. Flint suggested the City make an offer to the City of Wayzata to <br />allow them to jointly use Orono's Public Works facility. Mayor Jabbour concurred with Flint and <br />added the offer should also be extended to the City of Long Lake. <br />Peterson asked if the site was large enough. Mayor Jabbour replied that the Public Works facility <br />was designed to allow for expansion. <br />Flint moved, Peterson seconded, to make an offer to both the cities of Long Lake and Wayzata of <br />an opportunity to share a maintenance facility at the Orono Public Works facility by expanding the <br />existing facility. Vote: Ayes 5, Nays 0. <br />Peterson questioned if monies from Mn/DOT for the reconstruction of the Public Works facilities <br />for Long Lake and Wayzata would be generated which could help pay for the addition to the Orono <br />facility. <br />• Mayor Jabbour directed Mooise to contact the Long Lake and Wayzata City Administrators, and <br />Mayor Jabbour would contact the Mayors from those two cities. <br />Kelley inquired about the status of the County Road 15 and County Road 6 projects and any <br />concerns from neighbors. <br />Gappa reported that County Road 6 is on schedule and a substantial amount of grading is done. <br />Rock and sand is scheduled to be down on the whole road by the beginning of September and the <br />first coat of pavement down by mid - September. The City had a few calls regarding the difficulty <br />with accesses due to the rain. No complaints were received about grading, but there were some <br />complaints regarding tree removal. <br />Gappa reported numerous complaints regarding County Road 15. Additional surcharge material was <br />needed because they did not get the settlement they expected. In a week or two, when it has settled, <br />they will be hauling the extra surcharge off, which will cause additional traffic complaints with the <br />trucks hauling. <br />• 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.