My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-2016 Council Packet
Orono
>
City Council
>
2016
>
04-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2016 8:20:53 AM
Creation date
9/30/2016 8:13:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br />DATE: April 25, 2016 <br /> ITEM NO: 5 <br />_____________________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: Watertown Road with Long Lake Award Approval <br />________________________________________________________________________________________________________ <br /> <br />References <br />a. Joint Powers Agreement (JPA), May 26th 2015. <br />b. Feasibility Report, September 15th, 2015 <br /> <br />List of Exhibits <br />a. Bid Summary <br /> <br />1. Purpose. The purpose of this action item is to update the Council on the design, by WSB, for the <br />Watertown Road project with Long Lake and authorize the solicitation of bids for the project. <br /> <br />2. Background. Watertown Road is a collector road for the City of Orono. From Willow Road to Brown <br />Road the responsibility for its care is shared with the City of Long Lake due to the alignment of the <br />Cities’ boundaries. Orono owns 29.5% of the road surface by square footage along this stretch of road <br />with Long Lake owning the remainder. Long Lake is proposing to rebuild this section of the road in 2016 <br />and is looking to partner with Orono to do so. Long Lake is rebuilding the road and replacing the utilities <br />that currently run under this section of Watertown Road. Orono does not have any utilities under this <br />section of Watertown road. In May of 2015, both Long Lake and Orono approved a Joint Powers <br />Agreement (JPA). The JPA authorizes Long Lake to manage the project with Orono participating through <br />funding. The JPA requires both City Councils to approve the final plans to award the project. <br /> <br />3. Scope of Work. The project consists of the reclamation of the bituminous pavement, select subgrade <br />corrections, and the replacement / improvement of the associated stormwater system. <br /> <br />4. Cost/ Funding. Per the JPA Orono shall contribute 29.5% of a road reconstruction, storm sewer, <br />construction, administration and materials testing costs up to $133,800. The cost to Orono is based on the <br />low bid of $123,758.68. The project was originally scheduled to be funded entirely from the pavement <br />management fund, however, approximately 19% of the cost can be allocated to stormwater work. <br />Fund Cost Amount Allocated <br />in the CIP <br />Est. Fund Balance at <br />end of 2016 <br />Pavement Fund $ 95,290.92 133,796 $ 0 <br />Storm Water Fund $ 28,467.76 $ 0 $ 1,129,594 <br />Total $ 123,758.68 <br /> <br />6. Timing. Long Lake is scheduled to award the project at their May 17th meeting. The project would be <br />completed this summer and synchronized with our Watertown Road Phase 2 project. <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to accept the design and authorize the solicitation of bids for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.