Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON FEBRUARY 23, 1998 <br />( #8 - #2326 Orono Development - Continued) . <br />Jabbour asked about the public easement for the pedestrian connection to Olive Avenue. <br />Gaffron noted the conceptual approval for vacation of a portion of Navarre Lane <br />required public easements for a trail connection. It was concluded that a pedestrian trail <br />would not be appropriate but a walking path would travel across the parking lot from <br />Olive Avenue to the sidewalk. Gaffron questioned whether a public easement should be <br />taken, noting the question would arise of who would maintain it. <br />Gaffron said the Planning Commission's primary concern was for the front parking <br />setback along Shadywood. Gaffron reviewed the specific problems in changing the <br />setback resulting from the difficult site, stormwater ponding, retaining wall, and driving <br />lane for drive - through exit and rear deliveries. The applicants feel the building depth is at <br />its optimum. The two rows of parking are necessary. While the Planning Commission <br />asked that the plan be reviewed to see if an additional 10' could be found for the setback, <br />they were otherwise satisfied with the revised plan. <br />Gaffron reviewed the topics discussed at the Planning Commission level. Grading and <br />drainage plan indicates grading within 5' of the property line. The plan was reviewed by <br />the adjacent property owner to the north The slope along the north lot line has been <br />flattened to a 2:1 ratio and the building raised in order to accomplish this resulting in a <br />4% maximum slope for the parking lot as recommended by the City Engineer. Gaffron <br />indicated follow -up is necessary for the conceptual vacation of Navarre Lane, which can • <br />be accomplished in the resolution draft. The remaining concern is again with the 5' front <br />setback and its impact on the future look of the Navarre area. <br />Tom Dillon said the building was a one -story design with a brick base and cedar shake s <br />above with four entry points. The building is designed for 6 -7 tenants. The plan calls for <br />a bank building of 4500 s.f. with corporate bank offices. The pitched roof will be of <br />asphalt shingling. There will be three driving lanes to the rear for traffic circulation, <br />drive- through access, and deliveries. The building includes many windows to allow for <br />light to flow into the building. Dillon believes the building design and materials will <br />compliment the lake area. He has received good comments from the tenants and <br />neighbors. <br />Dillon reported that the elevation changes on the site from 942 to 970. The site is <br />hemmed in by the pond, which will be upgraded to handle runoff for the two sites. The <br />parking stalls are 9'x20'. There will be a 20' driving lane and double loading to allow for <br />drive- through traffic and deliveries. The 8' -12' high retaining wall will aid in handling the <br />change in grade. Room is required to accommodate this change in grade effectively. <br />Dillon noted the trash enclosure is located outside and would be screened. All of the <br />existing trees will be removed. Dillon said they have worked closely with Staff and <br />consultants to address issues of concern. Possible outdoor seating area will be provided <br />in the front to gain a neighborhood feel. <br />10 <br />