My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
note to planning commission from homeowner
Orono
>
Property Files
>
Street Address
>
F
>
Forest Lake Landing
>
4455 Forest Lake Landing - 07-117-23-24-0037
>
Correspondence
>
note to planning commission from homeowner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:04 PM
Creation date
9/28/2016 11:32:56 AM
Metadata
Fields
Template:
x Address Old
House Number
4455
Street Name
Forest Lake
Street Type
Landing
Address
4455 Forest Lake Landing
Document Type
Correspondence
PIN
0711723240037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Cjt� yy���- G,,r� �.Np` July 26, 2004 <br /> Orono Planning Commission <br /> RE: New proposed construction—(2004 and 2005) <br /> 1146 Wildhurst Trail <br /> 4475 Forest Lake Landing—(lots 22 &23) <br /> Two sites, 1146 Wildhurst Trail and 4475 Forest Lake Landing, are making plans to <br /> demolish and rebuild. Both properties involve hillside run-off that directly affects our <br /> property. Our concern is water management. This is a serious matter on Saga Hill clay. <br /> Our property sits below the hill in regard to both of these construction sites. <br /> Regarding 1146 Wildhurst Trail: <br /> 1) The new house will be sited higher on the hill and more directly above us than the <br /> present structure. Our home will be even more vulnerable to unmanaged water. <br /> 2) The present drainage receptacle located at the SW corner af the Wildhurst house <br /> will be disturbed during construction. This receptacle handles the driveway and <br /> some hardcover run-off and directs it away from our property. Our concern, <br /> therefore, is for water management during construction as well as after the project is <br /> completed. <br /> Regarding 4475 Forest Lake LandingiLots 22 & 23: <br /> 1} The new house will be set deeper on the lot, closer to our house. The hardcover will <br /> be directly above the North end of our property and could create a run-off issue. <br /> 2) During construction, trucks will invariably drag mud onto Forest Lake Landing. <br /> Our concern is that this mud will end up in our driveway. Our drive is already the <br /> recipient of all run-off from Forest Lake Landing a.nd part of Wildhurst Trail. We <br /> haul wheelbarrow loads of sand and silt away after every rainfall and do not wish to <br /> add mud to that equarion. <br /> Both of these projects directly concern us because our property sits below the hill of both <br /> construction sites. We're asking that particular attention be made to water management <br /> issues for both projects, during and after construction, so that our property is not <br /> adversely affected. <br /> Sincerely, <br /> �=-� � <br /> �y,� + , � <br /> .,� ►J C:=--��-z,�--�.� <br /> �����-G� /� ` �?��.�?1i <br /> Sanford .��Ma aret J. Erikson <br /> 4455 Forest Lake Landing <br /> Mound, MN. 55364 <br /> (952)472-7637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.