My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01377 - land alteration
Orono
>
Property Files
>
Street Address
>
F
>
Forest Lake Landing
>
4415 Forest Lake Landing - 07-117-23-24-0047
>
Permits/Inspections
>
2014-01377 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:28 PM
Creation date
9/28/2016 11:08:19 AM
Metadata
Fields
Template:
x Address Old
House Number
4415
Street Name
Forest Lake
Street Type
Landing
Address
4415 Forest Lake Landing
Document Type
Permits/Inspections
PIN
0711723240047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. City of Orono <br /> Zoning Permit Application <br /> O Mailing Address: Permit number: p�D� —L� � �J / <br /> � �O PO Box 66 Date received: �—Z�-'/ <br /> Crystal Bay, MN 55323-0066 <br /> Escrow#and <br /> Street Address: amount: <br /> y �„ 2750 Kelley Parkway Permit Fee: �� <br /> � Orono, MN 55356 <br /> � L <br /> � Approved by: <br /> �KFSHO�� Fax: 952-249-4616 Notes: <br /> Main: 952-249-4600 `�'�`�✓'��ci.orono.mn.us <br /> This application form must be completed in full and all required information must be submitted. (Please print.) <br /> Job Site Address: i I �� ������ 61C(,� ���t �`�� <br /> CONTRACTOR/APPLICANT INFORMATION: <br /> Name: <br /> Phone: Fax: <br /> Address: City: ZIP: <br /> Contact Person: ContacYs phone number <br /> Email Applicant is: Contractor Homeowner (Circle One) <br /> PROPERTY OWNER INFORMATIO : ' <br /> Name: �/l-C' �~��'� <br /> Phone (day): � - � <br /> Mailing Address: - C��' `/'ll' ZIP: <br /> Email and/or Fax � ,�� <br /> Overall Project Description: � � �� <br /> Check TYPE OF PERMIT <br /> Box COST* <br /> Dock, Commercial $50+ engineering review costs <br /> Escrow for erosion control and en ineerin review costs $2,000 <br /> Dock, Residential — Permanent dock on any lake or initial seasonal dock not $50 +engineering review costs <br /> on Lake Minnetonka ermanent dock re uires CUP <br /> Hardcover Permit: Driveway, Patio, Sidewalk, Etc. (New or Replacement) No charge <br /> � Also requires is a Minor or Major <br /> Land Alteration Permit <br /> Land Alteration, Major(grading, filling, or excavating) more 500 cubic yards $50 <br /> or more than 10 cubic yards in lakeshore setback(also requires CUP) <br /> Escrow for erosion control and en ineerin review costs As determined b CUP <br /> � Land Alteration, Minor(grading, filling or excavating)—500 or less cubic $50+ engineering review costs <br /> �� yards outside of lakeshore setback or less than 10 yards in lakeshore setback <br /> Escrow for erosion control and en ineerin review costs $2,000 <br /> Retaining Wall measuring under four feet require a zoning permit. $50+ engineering review costs <br /> Retaining walls measuring more than four feet(from bottom of footings to top <br /> of wall) require a building permit. (Tiered retaining walls are considered one <br /> wall unless the walls are separated by twice the height of the lower wall.) <br /> Escrow for erosion control and en ineerin review costs $2,500 <br /> Stairway or Lifts to Lake (New or Replacement) $50+ engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Structure Permit for other structures not requiring a building permit but $50+ engineering review costs <br /> regulated by the zoning code (including, but not limited to accessory building <br /> of less than 120 square feet, detached deck or platform and sport court) <br /> Escrow for erosion control and en ineerin review costs $2,500 <br /> Tree Removal or other ve etation removal in 0 to 75 foot zone No char e. Pre-inspection required. <br /> Temporar Construction Office/Trailer associated with buildin ermit $30 <br /> (over) <br /> *Permit fee will be collected when the permit is issued. <br /> Updated: January 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.