My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00484 - new structure
Orono
>
Property Files
>
Street Address
>
F
>
Forest Arms Lane
>
945 Forest Arms Lane - 07-117-23-12-0019
>
Permits/Inspections
>
2015-00484 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:30:36 PM
Creation date
9/26/2016 2:21:21 PM
Metadata
Fields
Template:
x Address Old
House Number
945
Street Name
Forest Arms
Street Type
Lane
Address
945 Forest Arms La
Document Type
Permits/Inspections
PIN
0711723120019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Monday, May 11, 2015 8:36 AM <br /> To: 'Mike Fritz'; 'Jennifer Storms' <br /> Cc: 'jjeaton1@comcast.net'; 'dan@cssurvey.neY; Melanie Curtis; Lyle Oman <br /> Subject: 945 Forest Arms Lane/#2015-00484 <br /> Attachments: escrow agreement.pdf <br /> Mike, <br /> Our engineer has reviewed the survey dated 4-23-2015 and has the following comments: <br /> 1. Site plan depicts retaining walls on the south west corner of the home. Top and bottom wall heights are not <br /> depicted as required by city survey standards. Based on the associated terrain elevations the top wail appears <br /> to exceed 4 feet and taken as a set the two walls appear to exceed 6 feet. Walls 4' or greater in height must be <br /> designed by a licensed professional, and plans must be submitted to the City for review prior to the approval of <br /> the permit. Walls less than 2x the height of the upper wall apart shall be considered one wall. <br /> 2. As depicted the proposed driveway would shed any runoff onto the road way. The driveway must be <br /> constructed in a way to direct water to either side prior to reaching the roadway. <br /> 3. The erosion control measures depicted do not appear to provide adequate coverage for the front of the <br /> proposed house. The silt fence or other control mechanism should be planned for that section as well. <br /> Please update the site plan to address our engineers comments and submit two,full-size site plans for our review. <br /> Also attached is an updated escrow agreement. Please have the property owner sign the updated agreement and <br /> return. No additional escrow money is needed at this time. <br /> If you have any questions, please don't hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356 (physical addressJ <br /> PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ <br /> '�' 952.249.4620 � � 952.249.4616 <br /> � cmattson@ci.orono.mn.us � �1 www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> PLEASE NOTE: Summer Office Hours start Monday, May 18,2015 <br /> Monday-Thursday: 7:30 am to 5 pm/ Friday 7:30 to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday, May 25, 2015 (Memoria/DayJ <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.