|
�. . . . _ . _. ... . .. _--.. . . . -._--_-.__.. .
<br /> I�b�pdRMN 5368�'�9ht Commercial HVAC Loads � Eaton 345 Fo efst Arm�s Lanle,Orono�,'MN
<br /> -- -- ----_----__- __ _ _P�q�6_.
<br /> Total Building Summary Loads
<br /> _ -- -
<br /> . -------------
<br /> . _-- _ __---
<br /> Component � . ,.<.`` Area Sen Lat Sen Total
<br /> I Descri�tion __,------------- _..-- ----_ _ Quan _ _ Loss Gain Gain Gain '.
<br /> 1 D-cv-o: Glazing-Double pane, operable window, clear, 48.3 2,288 0 1,740 1,740
<br /> vinyl frame, outdoor insect screen with 100%
<br /> ; coverage, light color drapes with medium weave with
<br /> ' 50% coverage, u-value 0.57, SHGC 0.56
<br /> i 1 D-cv-o: Glazing-Double pane, operable window, clear, 438.6 20,746 0 24,090 24,090
<br /> vinyl frame, u-value 0.57, SHGC 0.56
<br /> ' 11P: Door-Metal- Polyurethane Core 42 1,010 0 328 328
<br /> , 12F-Osw: Wall-Frame, R-21 insulation in 2 x 6 stud 1671 9,014 0 1,770 1,770
<br /> cavity, no board insulation, siding finish, wood studs
<br /> 1560-10sf-2: Wall-Basement, , R-10 board insulation to 966.1 6,222 0 750 750 '
<br /> floor, no interior finish, 2'floor depth '
<br /> 12F-Obw:Wall-Frame, R-21 insulation in 2 x 6 stud 292.1 1,576 0 221 221
<br /> cavity, no board insulation, brick finish,wood studs
<br /> ', 166-50: Roof/Ceiling-Under Attic with Insulation on Attic 2073.3 3,441 0 2,115 2,115
<br /> Floor(also use for Knee Walis and Partition
<br /> Ceilings), Vented Attic, No Radiant Barrier, Dark
<br /> Asphalt Shingles or Dark Metal, Tar and Gravel or
<br /> Membrane, R-50 insulation
<br /> 21 B-28: Floor-Basement, Concrete slab, any thickness, 2 1800 2,241 0 0 0
<br /> or more feet below grade, R-3 or higher insulation
<br /> installed below floor, any floor cover, shortest side of
<br /> , floor slab is 28'wide
<br /> ' Subtotals for structure: 46,538 0 31,014 31,014
<br /> People: 0 0 0 0
<br /> Equipment: 0 0 0
<br /> Lighting: 0 0 0 '
<br /> Ductwork: 0 0 0 0 '
<br /> � Infiltration: Winter CFM: 103, Summer CFM: 54 9,113 1,073 925 1,998
<br /> � Ventilation:Winter CFM: 130, Summer CFM: 130 4,606 2,572 888 3,460
<br /> , Exhaust: Winter CFM: 130, Summer CFM: 130
<br /> AED Excursion: 0 0 6,263 6,263
<br /> Total Building Load Totals: 60,257 3,645 39,090 42,736
<br /> - ---- - - -,
<br /> Check Figures -- ------------------ ----�
<br /> Total Building Supply CFM: 1,790 CFM Per Square ft.: 0.462
<br /> Square ft. of Room Area: 3,873 Square ft. Per Ton: 1,088
<br /> Volume (ft') of Cond. Space: 34,860
<br /> -- --- _
<br /> __ ---- -- -- -
<br /> -- -
<br /> ' B ailding.Loads_- ____ --
<br /> __ .__ ----- --__ - --- ---- _ _ -
<br /> ' Total Heating Required Including Ventilation Air: 60,257 Btuh 60.257 MBH
<br /> Total Sensible Gain: 39,090 Btuh 91 %
<br /> Total Latent Gain: 3,645 Btuh 9 %
<br /> Total Cooling Required Including Ventilation Air: 42,736 Btuh 3.56 Tons (Based On Sensible+ Latent)
<br /> _--- ____
<br /> _ __-- _ _----_
<br /> . ._--------_
<br /> Notes __ _ -- _ _ ---� .
<br /> - ----._.____-------
<br /> --- -- ---
<br /> _ ___._ ._ --- - -------�
<br /> Rhvac is an ACCA approved Manual J and Manual D computer program. ',
<br /> , Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
<br /> , All computed results are estimates as building use and weather may vary.
<br /> ; Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
<br /> your design conditions.
<br /> C:\...\Eaton New Construction.rh9 Tuesday, April 21, 2015, 9:56 PM
<br />
|